# AC 145-5 CHG 1 Ed Update 2: Repair Station Internal Evaluation Programs

- Type: Advisory circular (guidance, not mandatory unless a rule or AD requires it)
- Status: Current
- Approved: September 25, 2026
- Last reviewed: September 28, 2026
- This change: Second editorial update of CHG 1 of AC 145-5.
- Family: AC 145-5
- Cancels: [AC 145-5 CHG 1 Ed Update](https://openairdocs.org/ac/145-5-CHG-1-Ed-Update)
- 14 CFR parts: 145
- 14 CFR sections: [145.211](https://www.ecfr.gov/current/title-14/section-145.211), [145.201](https://www.ecfr.gov/current/title-14/section-145.201), [145.215](https://www.ecfr.gov/current/title-14/section-145.215), [145.109](https://www.ecfr.gov/current/title-14/section-145.109), [145.161](https://www.ecfr.gov/current/title-14/section-145.161)
- Pages: 29
- PDF: https://openairdocs.org/files/sha256/00/21/00219e92cff90277a824a2bc860f6bf666342e701c12aa8366d11dafbd654b1c
- FAA DRS: https://drs.faa.gov/browse/excelExternalWindow/DRSDOCID114618821620260928160240.0001
- DRS record last changed: September 28, 2026
- Page: https://openairdocs.org/ac/145-5

## Versions

- [AC 145-5 CHG 1 Ed Update 2](https://openairdocs.org/ac/145-5) (Current), approved Sep 25, 2026, 29 pages. Second editorial update of CHG 1 of AC 145-5.
- [AC 145-5 CHG 1 Ed Update](https://openairdocs.org/ac/145-5-CHG-1-Ed-Update) (Historical), approved Jul 28, 2022, 29 pages. Editorial update of CHG 1 of AC 145-5.
- [AC 145-5 CHG 1](https://openairdocs.org/ac/145-5-CHG-1) (Historical), approved Feb 16, 2017, 33 pages. CHG 1 of AC 145-5.
- [AC 145-5](https://openairdocs.org/ac/145-5?v=6D35DFCED414E703862569E00074D653) (Historical), approved Sep 27, 1995, 36 pages

## ADs that cite it (1)

- [AD 2022-21-15](https://openairdocs.org/ad/2022-21-15) (historical): Fuselage Miscellaneous Structure · Diamond Aircraft Industries DA 42, DA 42 NG and DA 42 M-NG. Effective Dec 14, 2022

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

U.S.

Department of Transportation Federal Aviation Administration Advisory Circular Subject: Repair Station Internal Evaluation Programs Date: 2/16/17 AC No: 145-5 Updated: 9/25/26 Change: 1 (Editorial 2) Initiated by: AFS-300

1. PURPOSE OF THIS ADVISORY CIRCULAR (AC). This AC provides information and guidance material that may be used by repair station certificate holders operating under Title 14 of the Code of Federal Regulations (14 CFR) part 145 to design and implement an Internal Evaluation Program (IEP). The procedures and practices outlined in this AC can be applied to all of a repair station’s operations. The contents of this document do not have the force and effect of law and are not meant to bind the public in any way. This document is intended only to provide clarity to the public regarding existing requirements under the law or agency policies.

2. PRINCIPAL CHANGES. This change adds information about FAA compliance inspection results to paragraph 3; replaces the discussion of the Joint Aviation Authorities (JAA) with information about the European Union Aviation Safety Agency (EASA) in paragraphs 3 and 6;

adds new information regarding FAA resources and assistance for certificate holders to paragraph 10; replaces the related reading materials in Appendix 3 with new online resources;

and updates terminology and references throughout the document.

PAGE CONTROL CHART Remove Pages Dated Insert Pages Dated Pages 1 thru 5 9/27/95 Pages 1 thru 5 2/16/17 Pages 7 thru 20 9/27/95 Pages 6 thru 18 2/16/17 Appendix 1, Page 2 9/27/95 Appendix 1, Page 2 2/16/17 Appendix 2, Pages 2 thru 5 9/27/95 Appendix 2, Pages 2 thru 5 2/16/17 Appendix 3, Pages 1 thru 3 9/27/95 Appendix 3, Page 1 2/16/17 John Barbagallo Deputy Director, Flight Standards Service

### Page 2

U.

S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Repair Station Internal Evaluation Programs Date: 9/27/95 AC No: 145-5 Initiated by: AFS-300 Change:

1. PURPOSE OF THIS ADVISORY CIRCULAR (AC). This AC provides information and guidance material that may be used by repair station certificate holders operating under Title 14 of the Code of Federal Regulations (14 CFR) part 145 to design and implement an Internal Evaluation Program (IEP). The procedures and practices outlined in this AC can be applied to all of a repair station’s operations. There is no regulatory requirement for an IEP; however, the Federal Aviation Administration (FAA) encourages such a program to increase the awareness of management and all employees of their responsibility to promote continuous compliance with all regulatory requirements and good operating practices. Establishing the type of program described in this document is completely voluntary.

NOTE: This is a guidance document. Its content is not legally binding in its own right and will not be relied upon by the Department as a separate basis for affirmative enforcement action or other administrative penalty.

Conformity with the guidance document is voluntary only. Nonconformity will not affect rights and obligations under existing statutes and regulations.

2. RELATED READING MATERIAL. A list of additional information that may be useful in understanding and implementing an IEP can be found in Appendix 3, Information to Locate Related Reading Materials.

3. BACKGROUND. Although safety in air transportation is a responsibility shared by certificate holders and the FAA, the ways in which this responsibility is discharged differ. While the FAA monitors certificate holders’ compliance through periodic inspections, the certificate holders clearly have a superior vantage point in monitoring their own performance and have greater resources to do so than the FAA. Although the FAA provides standards and guidance and promotes compliance through its surveillance, enforcement, and other programs, it is the certificate holders upon whom rests the primary and ultimate responsibility to verify that their operations are continuously in compliance with all regulatory requirements. Because certificate holders are in the best position to identify deficiencies and promptly correct them, it is to their advantage to have a procedure in place whereby they monitor compliance and continuously improve their compliance posture. Internal reviews will improve the certificate holder’s ability to identify and correct compliance problems in a more timely manner. There are many ways to quickly identify and correct problems. One of the methods that has evolved over the past few years, primarily used by the air carrier industry, is called the internal evaluation.

### Page 3

Par 3 Page 2

a. Development of the IEP. The concept of an internal evaluation, as defined by the FAA, was developed in the late 1980s as part of several FAA initiatives to improve the partnership between the FAA and the air carrier industry.

(1) At that time, the FAA considered making an IEP a regulatory requirement. This contemplated regulation would have instituted a process whereby an air carrier’s management would be more directly responsible for not only complying with 14 CFR, but also having a system to continuously verify that operations were in compliance with 14 CFR, instead of relying on the FAA to do such verification through its surveillance. The FAA decided it was premature to develop a regulatory requirement. However, the FAA considered the concept to be sound and believed that voluntary IEPs should be strongly encouraged.

(2) Encouragement came in the form of meetings with industry representatives to explain the concept and discuss how the FAA could support such a voluntary program. In February 1992, the FAA published the Air Carrier Internal Evaluation Model Program Guide to provide additional guidance to the air carrier industry and to FAA inspectors on the implementation of IEPs for different types of air carrier operations.

b. Related Programs. The IEP is closely related to two other programs of interest to many certificated repair stations.

(1) The first program is the FAA voluntary disclosure policy. Under this policy, implemented for repair stations on May 20, 1994, if a repair station finds a potential violation of 14 CFR, reports it to the FAA, and meets other specific conditions, the FAA will not pursue an enforcement action.

(a) An IEP is an effective method for discovering potential violations and developing corrective actions that are aimed at permanently eliminating the underlying cause of a problem.

Corrective actions of this type are one of the requirements of the voluntary disclosure program.

(b) Even though the internal evaluation process supports voluntary disclosures, it is not necessary to have an IEP to participate in the voluntary disclosure program, nor is it necessary to voluntarily disclose any findings from an internal evaluation. Although the two programs work well together, they can be mutually exclusive.

(2) The second related program is the quality system required by the European Union Aviation Safety Agency (EASA) for organizations holding EASA Part-145 approval.

c. FAA Compliance Inspections Results.

(1) The responsible Flight Standards offices regularly conduct inspections of repair stations as a part of their surveillance work programs. Results of these inspections and routine surveillance indicate that there are recurring areas of noncompliance that would not have occurred as frequently, or at all, if IEPs had been implemented. These areas may include:

(a) Failure to maintain and follow a quality control system (QCS) as required by 14 CFR § 145.211.

### Page 4

Par 3 Page 3

(b) Failure to maintain and use the equipment, materials, and data required by 14 CFR § 145.109.

(c) Inadequate or noncurrent personnel records required by 14 CFR § 145.161.

(d) Performing work for which the repair station is not authorized (14 CFR § 145.201).

(e) Failure to follow the requirements contained in 14 CFR § 145.215 when utilizing a capability list.

(2) While an IEP will not eliminate all instances of noncompliance with the regulations, it will provide the certificate holder with a better overview of the organization, systems, and procedures that may, in fact, reveal systemic weaknesses or a lack of sufficient management controls. These weaknesses represent the potential for noncompliance; consequently, identifying them in a systematic manner will often permit corrective action before a noncompliance situation occurs.

4. DEFINITIONS. The following definitions apply to the discussion in this AC and may not be the same as similar terms used in other documents or applications.

a. Audit. A methodical, planned examination of processes, records, and transactions to verify compliance with a specific audit criterion. Inspections are normally a part of an audit.

Results are primarily presented in terms of findings and concerns. Auditing measures against a defined standard, but does not analyze the standard.

b. Concern. A conclusion concerning a system or process that identifies a condition that may become a finding or a system weakness, which could be the underlying cause of a future noncompliance situation. A concern is not, at the time of the examination, an example of noncompliance with a standard. If so, it would be a finding.

c. Control. A key procedure, responsibility, or decision-making position within an organization or functional area. Effective controls reduce the probability of action contrary to established requirements and reduce the adverse consequences of such actions should they occur.

The controls used in all phases of the repair station’s operations should receive the majority of the attention from the internal evaluation.

d. Evaluation. An examination and evaluation of all aspects of a process, both positive and negative, that includes a review of standards, if appropriate. An evaluation is a process designed to take a larger view of an operation or organization than an audit. An audit is a subset of an evaluation. Results of evaluations are presented in terms of findings, concerns, observations, and recommendations.

e. Finding. A conclusion, supported by evidence, that there has been or is a process or product that is not in compliance with an established standard.

f. Inspection. A critical examination of an event or object for conformance with a standard.

Results of inspections are reported only in terms of findings.

### Page 5

Par 4 Page 4

g. Internal Evaluation. A comprehensive, continual monitoring process that is initiated and managed by the repair station, even though the personnel actually conducting various audits as part of the evaluation program may be internal or external to the repair station. The objective of this process is to promote attitudes and procedures that build quality into a product rather than depending on corrections of deficiencies to meet quality goals.

h. Observation. A noteworthy feature of a system or procedure. The feature noted is usually a positive or commendable aspect that should be brought to the attention of management to ensure that the feature is preserved and perhaps adopted in other places, if appropriate.

i. Recommendation. A specific suggested action that addresses a deficiency (either a finding or a concern). A recommendation from an internal evaluation team should be analyzed to determine if it should be adopted. Correction of deficiencies should be the responsibility of the affected organization.

j. Top Management. A certificate holder’s Chief Executive Officer (CEO), Chief Operating Officer (COO), president, or a person in an equivalent position who has the authority to resolve issues and take action and can be held accountable for quality issues. The FAA believes that top management should be well aware of the plans, results (findings, concerns, and observations), and followup actions undertaken in an IEP.

5. PROGRAM FEATURES. Internal evaluations should be part of an overall IEP that has written descriptions of the key elements of the program. The program should have a structured and planned series of evaluations that are designed to improve the quality of all steps and functions in the process that lead to a final repair station product.

a. Understanding the Basic Features. An IEP is:

(1) A Systems-Oriented Process. A continual process that incorporates the techniques of inspections, audits, and evaluations to assess the adequacy of managerial controls and processes in critical systems and to continuously improve those systems based upon the results of regular evaluations.

(2) More Than an Audit. A review that extends beyond regulatory compliance to determine the causes of deficiencies and detect needed enhancements to company operating practices before deficiencies occur. An IEP would normally verify compliance with company procedures, policies, and sound business practices, as well as legal requirements.

(3) A Corrective Process. A process that analyzes deficiencies, develops corrective action plans (CAP) to correct deficiencies, and performs followup evaluations to verify that those corrections have taken place and have been effective.

(4) A Program with High-Level Attention. An independent process that organizationally has straight-line reporting responsibility to top management.

(5) An Additional Quality Assurance (QA) Process. The IEP should not be misunderstood as a program that replaces existing regulatory requirements, such as the QCS described in 14 CFR § 145.211. It is comprehensive and includes identifying corrective actions,

### Page 6

Par 5 Page 5 verifying that those actions have taken place, and ensuring that problems do not reoccur. Further, one of the most critical aspects of an IEP is the regular day-to-day involvement of top management, which typically distinguishes it from the normal repair station inspection functions.

b. Broad Applicability. The internal evaluation should cover all systems, processes, and products that are basic parts of the repair station’s activities. There is no set list of items to be covered since each operation is unique, but a representative list of areas to evaluate would include:

(1) Facilities and equipment.

(2) Repair station authority and limitations versus actual practice, including controls over any deviation authority.

(3) Personnel qualifications, training, and staffing levels.

(4) Manuals and airworthiness data.

(5) Continuity of work and supervision during personnel changes.

(6) Supplier selection, approval, and surveillance.

(7) Parts and materials handling.

(8) Inspection and quality control (QC) processes.

(9) Tool adequacy and calibration.

(10) Maintenance release process.

(11) Defect reporting.

(12) Records and recordkeeping procedures.

c. Potential Benefits. An effective IEP may bring benefits to repair stations that go beyond regulatory compliance. The discipline, structure, and added oversight afforded an organization through internal evaluation can provide better management information and controls, leading to increased efficiency.

6. IEP DESCRIPTION. The following are essential elements of an IEP. Each of these should be described in a program document.

a. Independent and Well-Defined Responsibility. As a part of identifying internal evaluation responsibility and independence, certificate holders should identify resources and personnel to conduct the IEP, and they should describe their organizational independence within the company in light of their internal evaluation functions. Individuals conducting internal evaluations should not be responsible for accomplishing or managing work in the areas being evaluated or the tasks being reviewed. This concept may have to be modified for some very small operations.

### Page 7

Par 6 Page 6

(1) For some certificate holders, the size of the operation may justify the costs associated with having full-time, dedicated resources, and personnel in a separate internal evaluation department. However, when full-time, dedicated resources and personnel are not practical, procedures should be established so that any persons having direct responsibility for the areas to be evaluated are not involved in the selection of the evaluation team.

(2) At very small operations, a reasonable IEP might consist of developing checklists and a schedule (monthly, quarterly, semiannual, or annual) for accomplishing checklist items. Even in such cases, the review should include a written statement acknowledging the completion of the checklist items and the signature of a top management official. Under these conditions, occasional independent oversight of checklist item development and accomplishment should be considered.

(3) Certificate holders that use outside resources in support of, or to accomplish, an IEP should show that use of those outside resources is coordinated through a chain of command that reflects independence and contact with top management.

(4) A certificate holder’s IEP document should identify the person and/or group within the organization who has the responsibility and authority to:

(a) Perform or cause to be performed evaluations, audits, and inspections as a part of an ongoing IEP.

(b) Identify and record any findings or concerns and the evidence necessary to substantiate those findings or concerns.

(c) Recommend or assist with the development of solutions to findings or concerns.

(d) Verify the implementation of solutions consistent with the action plan and validate that solutions work.

(e) Communicate and coordinate activities with FAA personnel on a regular basis.

(5) A senior level management representative should accept the responsibility to ensure that an IEP is properly established, implemented, and maintained. Further, this individual should have the authority to see that appropriate corrective actions are implemented in a timely manner.

This management position should be above the level that directly supervises work accomplishment or procedural development and should have direct contact with the CEO or equivalent. For smaller certificate holders, it is appropriate that this person be the CEO, president, or equivalent.

b. Top Management Involvement and Accountability. An effective IEP has the attention of top management regularly, not just when the program is initiated. A key step is top management review of internal evaluation results to verify that satisfactory corrective actions have been implemented.

c. A Continual, Structured Process. In order to effectively anticipate potential problem areas and correct them before actual findings occur, an IEP should be a continual, ongoing

### Page 8

Par 6 Page 7 function. An internal evaluation is intended to be more than spot-check inspections of operating practices. Of and by themselves, spot-check inspections will do little more than identify symptoms of potential problems.

(1) A continual process is needed to verify whether findings are isolated instances or actual symptoms of policy, procedural, or managerial problems. A continual program should include scheduled evaluations, followup evaluations as necessary, and special evaluations when trends are identified.

(2) Having a well-structured program ensures that all areas of operations are covered at appropriate intervals. It also institutionalizes the process so that a change in personnel does not adversely affect the program.

d. A Plan for Scheduling Evaluations. It is essential for a repair station’s IEP to include a defined schedule of activities. This planned schedule will serve to verify that the IEP is comprehensive, well controlled, and timely. A published schedule also provides a vehicle for keeping management informed. A proper internal evaluation schedule should include a planned cycle for periodically reviewing areas specified to be covered by the certificate holder’s IEP.

However, the scheduling process should also be dynamic and allow for special evaluations when trends are identified. In addition, followup evaluations should be scheduled as necessary to verify that corrective action commitments were met and that they were effective in eliminating any reported findings or concerns. Planned, special, and followup evaluations, all of which comprise an effective internal evaluation schedule, are further described below.

(1) Planned Cycle. An effective program will establish a schedule of events that will be performed during a set calendar period under the IEP. All key areas will be reviewed at least once each year. It is helpful to divide the complete schedule into segments that are practical from the workload standpoint. However, it is important to schedule evaluations to allow enough flexibility for resources to be committed to special evaluations or followup evaluations, if needed.

(2) Special Evaluations. Conduct special evaluations based on concerns or priorities set by top management. The need for special evaluations can be driven by such factors as a review of industry trends, FAA concerns, or identified internal adverse trends.

(3) Followup Evaluations. Schedule and conduct followup evaluations to ensure that corrective action commitments were met, to verify that corrective actions (described in subparagraph 6e) were effective, and to review steps taken as a result of FAA surveillance findings.

e. CAPs. An IEP should include procedures that ensure that CAPs are developed in response to findings or concerns and for monitoring CAPs to verify their timely and effective implementation. Internal evaluation personnel should participate in the development of CAPs.

However, organizational responsibility and accountability for the development and implementation of CAPs should reside with the technical departments cited in the finding or concern.

### Page 9

Par 6 Page 8

(1) A proper CAP should include the following elements:

(a) A detailed description of the finding or concern and how it was discovered. This should include discussion of the scope and extent of the problem so that candidate solutions can be analyzed properly.

(b) Analysis of evidence to determine the root cause(s) of the finding or concern.

(c) Identification of planned corrective steps to be taken in response to the finding or concern.

(d) An implementation schedule, including a timeframe for putting corrective steps in place.

(e) The individual responsible for implementing each of the corrective steps.

(2) The individuals responsible for managing an IEP should facilitate the corrective action process by:

(a) Ensuring that CAPs are developed in a timely manner.

(b) Verifying that CAPs include the elements outlined above.

(c) Monitoring implementation of corrective actions.

(d) Providing top management with an independent assessment of CAP development and implementation.

(e) Initiating scheduled and/or unannounced followup evaluations to ensure the effectiveness of corrective steps specified in CAPs.

f. Records. The results of an internal evaluation and the review of internal evaluation information by top management should be documented in reports and other appropriate records, consistent with the process of internal reporting at the repair station. The repair station should decide upon the frequency, format, and structure for informing top management of internal evaluation plans, results, and followup actions. It is recommended that the reporting structure also be documented by the repair station and become a part of its program plan.

(1) IEP files should include:

• Scheduled evaluation reports;

• Special evaluation reports, including the trends or other reasons for scheduling a special evaluation;

• CAPs; and

• Results of followup evaluations.

### Page 10

Par 6 Page 9

(2) Recognizing that much of the information contained in IEP records could be proprietary, a repair station should maintain and secure these records on their premises. If given to the FAA, proprietary information will be protected by the FAA in accordance with applicable laws and regulations.

(3) Sharing IEP information with the FAA at the repair station offices can enhance the working relationship between the FAA and the repair station. Information not required by regulation that remains on the repair station’s property would not normally be subject to public disclosure.

g. Specialized Training and Experience for Evaluators. The evaluators that are used by the repair station should have training in the specific procedures used by the repair station.

(1) Evaluators should be trained and experienced specifically with the evaluation of quality systems. General inspection experience only is usually insufficient.

(2) The internal evaluation concept emphasizes the analysis of procedures, systems, and management controls. It is not another layer of transaction examination and hardware inspections. Rather than just verifying the work of the inspectors, for example, it analyzes the inspection system. Consequently, it requires different skills.

7. AUDITING PROCEDURES—EXAMPLE. The basic tool for accomplishing an evaluation is the audit. An audit provides assurances that an organization’s methods conform to its requirements, and it assesses the effectiveness of management controls. Audits help answer the question, “Are the actual practices consistent with the defined standards?” The example in Figure 1, Internal Evaluation Report—Example, demonstrates internal evaluation procedures and the use of auditing concepts in the context of a typical repair station function. This example addresses the procedures and systems for ensuring that all parts used in modifications or repairs are approved for such use. Additional information on auditing techniques is provided in Appendix 2, Auditing Techniques. The example demonstrates the need for an evaluator to understand the complete system and the applicable requirements. It is important to remember that the use of the word “system” in this discussion refers to all elements that impact a function:

the relevant policies, procedures, management, operating personnel, training, paperwork, facilities, and equipment.

a. Background. For the purposes of this example, assume that a repair station has an IEP in place and there are trained evaluators available, either within the company or from outside sources. As part of an ongoing series of audits, a small team of evaluators has initiated a review of the systems that the repair station uses to control its parts supply and ensure that only correct (approved) parts are used in any of its work. The objective of this internal evaluation task is to verify that the repair station has the proper procedures, personnel are properly trained, and the management controls are functioning so that unapproved parts will not be used. It is not simply a spot inspection of parts and/or the related paperwork to see if any unapproved parts can be found.

### Page 11

Par 7 Page 10

b. Process. For most internal evaluation tasks, including this example, the basic steps are as follows.

(1) Step 1: Understanding the System. The processes that could affect parts usage in this repair station include the establishment of policy, the documentation of procedures, the ordering system, the receiving inspection process, parts storage and tracking, parts selection by the mechanic, and feedback on the performance of parts. Each of these processes should be reviewed by internal evaluators. To illustrate the concept, the parts ordering and receiving inspection processes will be discussed. The types of questions that should be asked to help understand this system are illustrated below. Note that this is not a comprehensive list, but only examples of the types of questions that should be on the checklist. For the most part, the questions are oriented toward systems, procedures, and responsibilities rather than toward the inspection of parts.

(a) What written policy exists? Who is responsible for developing that policy? How is complete dissemination of the policy ensured?

(b) Where are the purchasing procedures found? Who is responsible for them and for seeing that they are followed? Who is responsible for parts selection when ordering? Are automatic reorder quantities periodically audited?

(c) How does the repair station identify approved sources of parts? Is there some form of supplier surveillance? How are rotables tracked when they are at another repair station?

(d) What are the receiving inspection procedures with regard to parts? Who is responsible for these procedures? How are the procedures updated when necessary?

(e) How do receiving inspections personnel know about the policy and procedures? If there is a change, what is in place to be sure the change is known by all inspectors?

(f) How are parts stored and traced in the inventory? If there is a shelf life, how is it tracked? What happens when a part in stock exceeds its shelf life?

(g) What is the system/procedure for a mechanic to draw a part from stock? Does this system protect against the selection of an incorrect or unapproved part? Does it work, based on personnel perceptions?

(2) Step 2: Identifying Controls. Once the evaluators have developed a good understanding of how the system operates, the next step is to identify the built-in controls that ensure the system functions in accordance with the certificate holder’s Repair Station Manual (RSM) or Quality Control Manual (QCM), or both, and 14 CFR.

(a) Does a schedule exist to conduct periodic reviews of the repair station’s policy to ensure that it reflects the actual functions of the repair station? When an item is added or deleted from the repair station’s capabilities, what procedures are in place to ensure company documentation is updated?

### Page 12

Par 7 Page 11

(b) Do purchase orders above a certain dollar amount require a higher level of management’s approval?

(c) How do purchasers know whether a source of parts is approved? Does the repair station have an approved vendor list, and is it periodically updated? Who is responsible for the list?

(d) Do the shipping and receiving facilities provide segregated areas for incoming and outgoing serviceable and unserviceable parts?

(e) Do inspection personnel receive training on receiving inspection procedures? Is the training documented? Do new inspection personnel receive indoctrination training before conducting receiving inspections?

(f) When inspection procedures are revised, do inspectors complete a record that indicates they have been made aware of the revision? Is this record reviewed to ensure all inspectors have received the appropriate information?

(g) Are periodic parts room inventories conducted to ensure that the inventory tracking system reflects the actual quantities on hand?

(h) Are shelf life sensitive items tracked separately in the computer or other tracking system? Do parts room personnel conduct periodic reviews of shelf life items and discard any expired items? Is it clear who is responsible? Is a report that documents the completion of the shelf life review provided to management? What happens if a shelf life item is found expired?

(i) Is access to the parts room restricted to authorized personnel or may anyone enter? How is access controlled? Who is responsible for ensuring that access is controlled?

(3) Step 3: Evaluation Controls—Do They Work? An evaluation of whether a repair station’s controls are properly functioning may require a review of records, inventory lists, parts documentation, warranty claim records, and an inspection of a sample of parts. Also, an important part of any verification process is the personnel interviews. If personnel do not know policies or feel that they are ignored, management controls are not functioning properly. The following types of questions may be used to conduct this portion of the evaluation.

(a) Does a record exist that indicates that a periodic policy review has been conducted? Is it complete and up to date? Does a review of the repair station’s procedures reconcile against the current QCM?

(b) Do high-dollar purchase orders indicate that management approved the purchase with a signature, initials, etc.?

(c) Do records list how many parts have been returned to vendors because they do not pass the receiving inspection? Does the current approved vendor list include a revision date?

### Page 13

Par 7 Page 12

(d) Do training records and interviews indicate that initial training and receiving inspection training have been conducted for inspection personnel? Do records indicate that training was conducted within a reasonable time after each revision of the RSM and/or QCM?

(e) How often are differences discovered between the inventory system and the actual number of parts on hand? Also, how often are stocks depleted without making a new order? How often must the repair station order items on an Aircraft on the Ground (AOG) status?

(f) When conducting the shelf life inventory, how often are expired items found? Do inventory records indicate that these items have been removed from stock and properly disposed of? If items were found that were substantially beyond limits, is there any documentation of what action was taken?

(g) How many warranty claims has the repair station been required to adjust in the past 6 months? How many FAA enforcement actions or letters of investigation has the repair station experienced in the past 6 months?

(h) Select a sample of parts using statistical sampling procedures (see Appendix 1, Program Plan Sample Outline). Are the parts properly tagged or otherwise identified? What paperwork is available to demonstrate that the part is approved?

(4) Step 4: Reporting the Results. Results of an audit generally do not cover positive items, nor do they recommend actions. Under an IEP, these, along with findings and concerns, are important elements of the report. Consequently, an evaluation report should include at least the following:

(a) Scope of the Evaluation. This should include the areas evaluated, personnel interviewed (in general terms to provide management an indication as to the scope and depth of the review without violating any confidentiality), records examined, sampling plans, etc.

(b) Results. Descriptions of each finding or observation presented in such a manner as to indicate the relative importance of each. This will allow responsible personnel to set priorities for developing responses.

(c) Recommended Corrective Actions. In some cases, there may be more than one alternative recommended; in others, there may not be sufficient information for the evaluators to develop a recommendation.

(d) Positive Results. Some might be shared between different units within the repair station.

(e) Internal Evaluation Report Form. An AC 145-5 evaluation report standard form should be established. A possible format is shown in Figure 1.

(5) Step 5: Developing CAPs. CAPs should be developed principally by the organization responsible for implementing the corrective action; however, if the evaluation team has properly conducted its evaluation, it will have a detailed understanding of the systems and procedures underlying the problems and should be able to assist with the analysis of alternatives.

### Page 14

Par 7 Page 13 The internal evaluation team should ensure that a CAP is developed in a timely manner and includes all the key elements, particularly when corrective action is to be implemented, and who is responsible for implementation.

(6) Step 6: Followup Evaluations. To be effective, the IEP should have followup evaluations any time a significant corrective action is planned. The purpose is twofold: to confirm that the action has taken place as planned and to verify that the fix has been effective. If a properly implemented corrective action does not work, new alternatives should be developed as soon as possible. Keeping management aware of the results of followup evaluations is an essential part of the program.

FIGURE 1. INTERNAL EVALUATION REPORT—EXAMPLE Date: September 30, 1994 Evaluation Area: Control of Parts.

Evaluation Objective: Evaluate the procedures and systems for ensuring that all parts used in modification or repairs are approved for such use.

Evaluator: J. Doe Method: Management controls identified per attached checklist; 10 percent sample of parts in the stock room and on the shop floor.

Findings/Concerns:

Findings: No significant findings. Isolated discrepancy resolved.

Concerns: The separation of serviceable and non-serviceable parts is not always clear. Although the tagging procedures were correct for the sample of parts reviewed, additional physical separation would increase the controls.

Proposed Actions: Reorganize the parts room to establish a separate area for the parts that are not serviceable. Consider separating those parts into those that are beyond economic repair and those awaiting repair or overhaul.

Followup Recommended: Y X N ____, within 6 months after the evaluation.

Report Routing: Director Material, Chief Inspector, Internal Evaluation File.

### Page 15

Par 8 Page 14

8. PROGRAM PLAN. The FAA recommends documenting IEP procedures and responsibilities in a program plan. This paragraph provides suggestions for preparing and structuring a program plan.

a. Planning Process.

(1) Certificate holders should determine what level of formal program plan development is consistent with the size and complexity of their operation.

(2) A program plan should describe the duties, AC 145-5 responsibilities, procedures, and organization of a certificate holder’s IEP. Terms and elements defined in program plans should be consistent with those outlined in paragraph 4.

(3) Copies of the program plan should be distributed to appropriate company personnel so that they are aware of IEP procedures. In addition, revisions should be made as necessary to ensure that the program plan continues to reflect the certificate holder’s current internal evaluation procedures and organization.

(4) Even if a certificate holder elects to prepare a written program plan or revise an existing plan, the FAA will not approve or otherwise formally accept program plan contents.

Documenting the procedures and responsibilities associated with any program is considered good practice. For certificate holders who choose to prepare a program plan, the FAA will be available to provide assistance, if requested.

b. Plan Structure. A sample outline of a program plan, using the program elements discussed in this AC, is provided in Appendix 1. This outline should be viewed as a sample of items that warrant consideration when a certificate holder is designing an IEP. The number of items addressed and how they are documented will ultimately depend on the complexity of the operation.

9. ORGANIZATIONAL MODELS. Each repair station is unique with regard to size, ratings, facilities, personnel resources, and method of operation. Therefore, no single type of structure will be appropriate for all types of internal evaluation organizations. Three basic types that may be used are a dedicated internal evaluation department (see Figure 2, Internal Evaluation Program Model: Dedicated Internal Evaluation Department), a dedicated individual manager and temporary evaluators (see Figure 3, Internal Evaluation Program Model: Dedicated Individual Manager and Temporary Evaluators), and a combination of internal and external resources (see Figure 4, Internal Evaluation Program Model: Combination of Internal and External Resources). Other organizational structures may also be appropriate. The most critical elements are an adequate level of independence and a reporting process that ensures an accountable manager is aware of the evaluation results. The internal evaluation process is generally more effective when these organizations have visible support from the highest levels of the company.

a. Dedicated Internal Evaluation Department. This model presupposes a large organization with multiple departments and, perhaps, satellite locations. This department is responsible for performing periodic, comprehensive evaluations of the entire organization. The department would report directly to the CEO or COO of the repair station as a staff function, yet

### Page 16

Par 9 Page 15 work closely with the operating departments to remain aware of current operating practices and to provide constant feedback to those departments.

FIGURE 2. INTERNAL EVALUATION PROGRAM MODEL:

**DEDICATED INTERNAL EVALUATION DEPARTMENT**

b. D edicated Individual Manager and Temporary Evaluators. This organizational model has only one individual fully dedicated to the internal evaluation process. Employees from the various operating departments, usually one from each department, are used as temporary evaluators. This method conserves personnel resources, yet ensures a continuing IEP using qualified personnel on a part-time basis. The selected individuals report to the head of internal evaluation only for the time they participate in the internal evaluation process. This model is suited to the medium-sized company where a full complement of dedicated internal evaluation personnel may not be justified.

### Page 17

Par 9 Page 16 FIGURE 3. INTERNAL EVALUATION PROGRAM MODEL:

**DEDICATED INDIVIDUAL MANAGER AND TEMPORARY EVALUATORS**

c. C ombination of Internal and External Resources. This model combines the use of internal and external resources to create a hybrid IEP. At least one company person is designated as the head of the internal evaluation function either on a full-time or part-time basis. This individual is supported by a combination of company, personnel, and external experts in the field to perform periodic comprehensive evaluations on the organization. The external experts may come from an industry association, a parent company, or a contracted organization. However, the primary internal resources remain responsible for the results of the evaluations, sharing of information with the FAA, incorporating needed changes to their ongoing duties, and the organization’s basic integrity.

### Page 18

Par 9 Page 17 FIGURE 4. INTERNAL EVALUATION PROGRAM MODEL: COMBINATION OF

**INTERNAL AND EXTERNAL RESOURCES**

10.

FAA RESOURCES AND ASSISTANCE. Although the development and implementation of repair station IEPs is completely voluntary, the FAA can provide assistance in developing, implementing, and the continuing operation of the program.

a. Principal Inspector (PI)-Provided Resources for Certificate Holders. Certificate holders should contact their PI. The PI can provide information on available resources, including data from various FAA databases. Internal FAA and/or privacy policies may limit the availability of some resources, particularly those of an automated nature. However, certain generic data may be helpful in identifying trends and suggesting areas that may warrant additional focus.

b. FAA-Provided Resources for PIs. Coordination through the PI will ensure appropriate consideration of each request for information or assistance made by the certificate holder. The PI may also request assistance from the responsible Flight Standards office or Office of Safety Standards (OSS), as required. Relevant training may be available through the FAA Academy (AMA), located at the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City, OK.

11. CONCLUSION. Development of IEPs, as discussed in this AC, should help the company to ensure that company policies and procedures are responsive to growth and change and continually comply with appropriate safety requirements. Furthermore, the FAA strongly encourages certificate holders to make IEPs an integral part of their everyday management process and take full advantage of the voluntary disclosure policy. Aviation safety is best served by programs that allow certificate holders to identify and correct instances of noncompliance and invest more resources in efforts to preclude their recurrence, rather than pay civil penalties after noncompliance.

### Page 19

Par 12 Page 18

12. WHERE YOU CAN FIND THIS AC. You can find this AC on the FAA’s website at https://www.faa.gov/regulations_policies/advisory_circulars.

13. AC FEEDBACK FORM. For your convenience, the AC Feedback Form is the last page of this AC. Note any deficiencies found, clarifications needed, or suggested improvements regarding the contents of this AC on the Feedback Form.

### Page 20

Appendix 1 APPENDIX 1. PROGRAM PLAN SAMPLE OUTLINE The following is an outline of a typical Internal Evaluation Program (IEP) plan, with brief descriptions of each main subject area.

1. OBJECTIVE AND POLICY. The objective should be a statement that clearly defines the purpose and structure of the repair station’s IEP. Policy statements following the objective should indicate that the corporate view of the program is that it is independent, that it actively involves top management, and that it is an ongoing process designed to identify potential problem areas.

2. DEFINITION OF TERMS. Terms that will be used consistently in the IEP should be defined. For example, a repair station should have a procedure for categorizing results

(e.g., a finding or concern). If desired, there can also be a scheme for ordering findings so that management can quickly identify the ones that have the most serious consequences. These categories, as well as other terms applicable to the internal evaluation function, should be clearly defined and documented so that company personnel can understand and properly interpret them.

3. DUTIES AND RESPONSIBILITIES. The duties and responsibilities of internal evaluation personnel should be documented.

a. The repair station should specify which personnel are responsible for performing the following tasks:

(1) Supervising the internal evaluation function.

(2) Developing evaluation schedules.

(3) Performing evaluations, audits, and inspections as a part of internal evaluation.

(4) Identifying and recording any findings or concerns.

(5) Collecting the evidence necessary to substantiate findings or concerns.

(6) Initiating, recommending, or providing solutions to problems.

(7) Monitoring the development and implementation of corrective action plans (CAP).

(8) Maintaining and updating internal evaluation files.

(9) Verifying the implementation of solutions.

(10) Coordinating IEP activities with FAA personnel.

b. This section of the program plan should show that personnel responsible for the tasks listed above are independent of company procedural development and work accomplishment that would be subject to evaluations. The supervisor of the internal evaluation function should either be from top management or have straight-line reporting authority to top management.

### Page 21

Appendix 1

c. When full-time dedicated resources are not practical, developed procedures should show that persons having direct responsibility for the areas to be evaluated are not involved in the selection or supervision of the internal evaluation team, nor are they involved in any evaluation functions. In addition, it is highly desirable to have temporary evaluation personnel exempt from other duties and completely dedicated to the IEP.

4. ORGANIZATION CHART. An organization chart that clearly shows the position of the internal evaluation function in the repair station’s organization should be prepared. This position should reflect both the program’s independence within the corporate structure and straight-line reporting to top management.

5. REPORTING PROCEDURES. Reporting procedures should show that top management will be informed through straight-line reporting channels about the schedule, plans, results, and followup actions of the IEP. The procedures outlined in this section of the program plan should specify the frequency, format, and structure for reporting information to top management. A procedure should also be developed that explains how the review by top management will be documented.

6. SPECIFIED AREAS COVERED. A certificate holder should specify the areas that are within the scope of review under the IEP. The FAA believes that the most effective IEP will encompass a complete review of all of the repair station’s technical operations. However, a repair station may elect to limit the evaluations to only a part of the technical operations, and it may elect to include nontechnical functions that are not subject to Title 14 of the Code of Federal Regulations (14 CFR) requirements. Also, the repair station may elect to phase in an IEP with limited coverage for an initial period and expanded coverage in later phases.

7. SCHEDULE PROCESS. The scheduling process should be comprised of the following elements:

a. Scheduled evaluations over a predetermined calendar period.

b. Special evaluations when trends are identified or priorities are set by top management.

c. Followup evaluations to verify the effectiveness of CAPs or in response to findings.

d. The program plan should include procedures for planning, developing, and coordinating the internal evaluation schedule. The responsibility for planning and developing schedule activities should also be defined.

8. RECORDS. The IEP should have a defined recordkeeping process. Procedures should specify how records are filed and maintained. Standard forms or formats for filing reports should also be specified. The following is a suggested list of records that should be maintained:

a. Scheduled evaluation reports.

b. Special evaluation reports.

c. Followup evaluation reports.

### Page 22

Appendix 1

d. Responses to findings or concerns contained in reports.

e. CAPs submitted in response to findings.

9. TRAINING. If feasible, the repair station should specify that evaluators receive some type of training in quality auditing and evaluation principles, and systems analysis techniques. This training could be from any one or combination of the following:

a. In-house training course or on-the-job training (OJT).

b. College courses.

c. Home study course materials.

d. Industry seminars and workshops.

### Page 23

Appendix 2 APPENDIX 2. AUDITING TECHNIQUES

1. PURPOSE. This appendix reviews some of the standard auditing techniques that would apply to evaluations conducted under a repair station Internal Evaluation Program (IEP).

2. INTRODUCTION. Every organization establishes plans, objectives, and a method for translating objectives into actions. This is generally accomplished through the development of policies, systems, and procedures.

a. Policies are decisions; systems and procedures are the methods for carrying out decisions.

Hence, establishing and maintaining effective policies, systems, and procedures are ways of controlling the activities of an organization.

b. Whatever an organization’s functional activities, some method of review or appraisal is necessary to compare accomplishments with intended policies, systems, and procedures.

Examples of poor products may be the result of a breakdown in procedures, lack of supervision, or insufficient management standards.

3. AUDIT PROGRAM. A management audit program is defined by its areas of examination.

In any management audit, the critical areas for review are:

a. Organization. How the area under appraisal is organized and how the actual organization compares to the stated company organization.

b. Policies. What policies exist and how effective are those policies? Such a review should also include a determination of how policies support compliance with applicable laws and regulations.

c. Systems and Procedures. What systems and procedures exist and what possible defects or irregularities exist?

d. Controls. What system controls exist and are they adequate and effective?

4. SYSTEMATIC AUDIT PROCEDURES. A systematic audit method is based upon accepted auditing practices, so that those relying on the auditing program can be confident that results are accurate.

a. The main steps in auditing are the planning, implementation, and reporting phases. In the planning stage, the scope and objectives of an audit are determined by the needs of the client (in conjunction with auditors) along with the timing for the initiation and completion of the audit.

Auditors are selected based on individual qualifications and the scope of the task. Work assignments for the auditors are determined. Entities within an organization are notified of a pending audit. The audit team makes a preliminary assessment of the established system

(e.g., controls, procedures, systems, and documentary evidence) within the area to be audited.

Checklists for the audit area are developed and a schedule for conducting the audit is determined.

b. Evidence is gathered via review of documents, observations, records checks, and interviews with key individuals in the areas under review. Detailed checklists are used to ensure

### Page 24

Appendix 2 that all areas of interest are covered. Auditors are careful to keep a record of auditor activities, including the times and dates for completing an audit activity. In that way, audit results can generally be reproduced, and the status of work completed and still to be accomplished is constantly known.

c. The evidence developed during an audit may be portrayed as findings or concerns. Upon completion of an audit, results are presented to relevant management before a written report is developed.

d. In the reporting phase of the audit, a written report on audit results is prepared, including information that can help the user of the report to take appropriate corrective actions. A written report generally will include a description of the purpose and scope of the audit, details of the audit activity, audit results, and supporting evidence.

5. APPLYING AUDITING TECHNIQUES TO INTERNAL EVALUATION. The following discussion provides an overview of the four fundamental steps suggested when conducting an audit under an IEP.

a. Identify Key System Characteristics: Understanding the Requirements. As a first step, an evaluator preparing an audit program needs to be cognizant of external requirements and other factors that may impact management’s decisions. Obvious examples of such external influences within the aviation environment include:

(1) Regulations.

(2) FAA guidance and policy.

(3) Equipment manufacturer guidance and specifications.

(4) Industry trends or incidents.

(5) An effective audit program includes provisions to verify that appropriate external influences are recognized in the management structure. An evaluator should use current FAA programs and materials (available through the responsible Flight Standards office to ensure that the audit program addresses all appropriate external requirements and other factors.

(6) An internal evaluation generally will go beyond merely verifying compliance with the regulations and other applicable legal standards. A thorough program will be designed to determine and evaluate how an organization’s policies, practices, systems, and procedures account for and incorporate all external and internal requirements. Accordingly, it is helpful for the evaluator to be able to translate pertinent requirements into key system characteristics.

(7) For example, 14 CFR § 145.161 states that a certificate holder must keep certain records pertaining to management, supervisory, and inspection personnel. A compliance audit would simply ensure that copies of personnel qualification records are maintained. The results either confirm compliance or noncompliance at the point and time of the audit, but provide no assurance that compliance will exist each day unless, of course, such an audit is done every day.

### Page 25

Appendix 2

(8) Like a compliance audit, an internal evaluation will also verify that qualification records are maintained in accordance with 14 CFR § 145.161. However, because internal evaluation is a management audit, the first step becomes identifying how this external requirement is managed within the personnel qualification process. In other words, an evaluator should recognize that the recordkeeping system is a key characteristic of the personnel qualification process.

(9) The personnel qualification process should include a series of controls that monitor and verify the retention of personnel qualification records. The evaluator needs to verify that management has designed the personnel qualification process to include such controls. An audit of personnel records should not begin until the existence of these controls has been verified.

b. Identifying System Controls: Use of the Checklist.

(1) The second step of the internal evaluation process involves translating the understanding of key system characteristics into a method for identifying system controls, which are inherent management features that ensure that internal and external requirements are fulfilled.

(2) A key technique for the evaluator to accomplish this step is through the development of a checklist. On the simplest level, a checklist denotes points to be checked. More importantly, checklists help evaluators and auditors determine the correct order in which to proceed with an evaluation. A checklist supplements an evaluator’s memory and provides the basis for reconstructing an audit trail.

c. Criteria Checklist.

(1) One important form of checklist is the “criteria” checklist. A criteria checklist verifies compliance with a standard, regulation, or called-for procedure. In essence, a criteria checklist question is the transposition of a standard, regulation, or procedural requirement into a question.

(2) For example, 14 CFR § 145.211 requires repair stations to prepare and keep current a Quality Control Manual (QCM) containing inspection procedures. A criteria checklist question of such a requirement asks, “Does the certificate holder maintain a current Quality Control Manual?” Standards, requirements, etc., often have subsets of standards. A criteria checklist, therefore, needs to address individual subsets of a particular standard. Each manual required by 14 CFR § 145.211 includes a number of required subsets, such as explaining the internal inspection system, stating the preliminary inspection procedures, and describing the continuity of inspection responsibility. Such subsets must be determined and made part of the criteria checklist when assessing a standard.

d. Departmental Checklist.

(1) Another type of checklist, sometimes referred to as a “departmental” checklist, structures questions according to discrete departments and/or tasks. Such checklists define the organization, resources, equipment (if any), and/or tasks, and ask questions such as:

### Page 26

Appendix 2

• What is the personnel level required for this department or tasks?

• Are sufficient personnel available to perform the task or departmental function?

(2) For example, a “departmental” checklist for the evaluation of a repair station’s incoming materials inspection process will ask questions such as:

• Who receives incoming parts and materials?

• Is the received part invoice compared to the purchase order?

• What procedure ensures that high priority parts are handled quickly and carefully?

e. Differences Between the Criteria and Departmental Checklist.

(1) As demonstrated from the above discussion, a departmental checklist goes beyond verifying that an organization complies with required criteria. A departmental checklist identifies the existence of controls within a given area to guide the accomplishment of external requirements and to meet internal plans and objectives.

(2) For example, recordkeeping should be a key characteristic of the personnel qualification process. A criteria checklist would ask, “Are personnel qualification records kept current?” A departmental checklist, however, would break down this requirement into a series of questions designed to identify the existence of controls that will ensure that adequate recordkeeping methods are a part of the personnel qualification process. For instance, questions might include:

• Who is responsible for maintaining personnel qualification records?

• What procedure verifies that personnel qualifications records are maintained for each supervisor? Are these procedures written?

(3) Obtaining answers to these types of questions is a primary part of the internal evaluation process. They provide indications of how well the organization is managing compliance. The answers help the evaluator identify areas of potential weakness, and thus determine best how to allocate audit resources to test the process.

f. Evaluation of Controls—Do They Work? Only after identifying the existence of key controls should the evaluator actually inspect, observe, or sample the defined audit population. In this manner, the evaluator not only verifies current compliance, but also evaluates the effectiveness of identified controls to ensure continuous compliance.

(1) An essential technique for the evaluator to apply during this step is sampling. A sampling rate of 100 percent would, of course, contribute to a high degree of reliability and accuracy. Practical considerations such as time and economics, however, often obviate the desire to sample every item in a population. But faced with 1,000 records of an action, how many records should an auditor examine before he or she can be reasonably certain that a conclusion about the records is reliable? Tables to guide sample size selection are readily available.

### Page 27

Appendix 2

(2) Table 1, Table of Sample Sizes – Number of Inspections Recommended to Achieve a 95 Percent Confidence Level, is an example of those used in sampling. This table is part of the guidance FAA inspectors receive for conducting inspections.

TABLE 1. TABLE OF SAMPLE SIZES – NUMBER OF INSPECTIONS RECOMMENDED TO ACHIEVE A 95 PERCENT CONFIDENCE LEVEL Population of Homogeneous Group Recommended Number of Inspections Up to 100 50% (up to 50) 200 40% (80) 400 35% (140) 500 33% (165) 1,000 28% (280) 2,000 16% (322) 3,000 11% (330) 4,000 8.8% (352) 5,000 7.7% (355) 10,000 3.7% (370)

(3) Evaluators should recognize that sampling is only one tool used in an audit. The sampling table above is used as part of a random sampling process. Random sampling of an entire population may not be the most effective means to check for a parameter. Samples supplement, but do not replace, common sense, good judgment, and experience. When combined with the results of the checklist, deficiencies found in the sample can begin to be evaluated as either isolated occurrences or signs of control/management weaknesses.

g. Reporting Results. As with any audit, the final stage of an audit performed under the internal evaluation approach should be the concise reporting of results.

### Page 28

Appendix 3 APPENDIX 3. RELATED READING MATERIALS LOCATION

1. RELATED READING MATERIALS (current editions):

a. European Union Aviation Safety Agency (EASA) Acceptable Means of Compliance (AMC) and Guidance Material (GM) to Part-145, Maintenance Organisation Approvals, available at https://www.easa.europa.eu/en/document-library/acceptable-means-of-complianceand-guidance-material/group/part-145---maintenance-organisation-approvals.

b. International Organization for Standardization (ISO) 9000, Quality Management Systems—Fundamentals and Vocabulary, available at https://www.ansi.org/.

c. AC 145-9, Guide for Developing and Evaluating Repair Station and Quality Control Manuals, available at https://www.faa.gov/regulations_policies/advisory_circulars/.

### Page 29

OMB Control Number: 2120-0746 Expiration Date:12/31/2027 Advisory Circular Feedback Form Paperwork Reduction Act Burden Statement: A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a currently valid OMB Control Number. The OMB Control Number for this information collection is 2120-0746. Public reporting for this collection of information is estimated to be approximately 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, completing, and reviewing the collection of information.

All responses to this collection of information are voluntary. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to:

Information Collection Clearance Officer, Federal Aviation Administration, 10101 Hillwood Parkway, Fort Worth, TX 76177-1524.

If you find an error in this Advisory Circular, have recommendations for improving it, or have suggestions for new items/subjects to be added, you may let us know by emailing this form to the Flight Standards Directives Management Officer at 9-AWA-AFB-120-Directives@faa.gov.

Subject:

AC 145-5 CHG 1, Repair Station Internal Evaluation Programs Date: _____________________ Please mark all appropriate line items:

☐ An error (procedural or typographical) has been noted in paragraph ____________ on page _______.

☐ Recommend paragraph _____________ on page __________ be changed as follows:

☐ In a future change to this AC, please cover the following subject:

(Briefly describe what you want added.)

☐ Other comments:

☐ I would like to discuss the above. Please contact me using the information below.

Submitted by: Date: ______________________ FAA 1320-73 (01/25) SUPERSEDES PREVIOUS EDITIONS

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.