# AD 49-38-02: Bolt Replacement

- Type: Airworthiness directive
- Status: Current
- Products: Boeing C54-DC, C54A-DC, C54B-DC, C54D-DC, C54E-DC, C54G-DC and DC-4
- Superseded by: Nothing supersedes this AD
- Product type: Aircraft, Large airplane
- Registered aircraft: 4 may be affected, by airframe or engine model (OpenAirDocs)
- FAA DRS: https://drs.faa.gov/browse/excelExternalWindow/961A3F2CD42E5517862569BC005C0E4F.0001
- DRS record last changed: May 30, 2024
- Page: https://openairdocs.org/ad/49-38-02

## The airworthiness directive

49-38-02 DOUGLAS: Applies to All Models C-54 and DC-4 Aircraft.

To be accomplished at every 9,000 hours total airplane flight time.

In those cases where the present bolts have or will have accumulated more than 9,000 hours time prior to the next regular overhaul period, the first replacement time may be extended, at the discretion of the CAA Inspector, to coincide with a regular overhaul period but in no case should the adjustment time exceed 1,500 hours accumulated after January 26, 1948. Thereafter the bolt replacement shall be at the 9,000- or 18,000-hour period, whichever is applicable.

Replace the following bolts: Fuselage to Center Wing Attachment; Outer Wing to Center Wing Attachment; Vertical Stabilizer Attachment to Fuselage Tail, Station 953; Engine Mount to Fire Wall Attachment; Horizontal Stabilizer to Fuselage Tail Assembly Attachment.

The 9,000-hour period may be extended to 18,000 hours when studs 4105725-1 and -2 in outer wing attachment have been replaced with special studs Nos. 4357723-1 and -2 having letter "R" stamped on thread end and bolts in all other attachments listed are replaced with NAS bolts with threads rolled after heat treatment.

The bolt part numbers and the number of bolts required are shown on pages 4 and 5 of the Douglas Service Magazine of August 1947. Bolts removed from the airplane are to be scrapped and are not to be used again.

(Douglas Service Letter No. 66, Supplement No. 2, dated July 18, 1951, covers this same subject relative to wing alignment at Station 421.)

This supersedes AD 48-04-03.

## Affected data sheets (1) (OpenAirDocs)

The type certificate data sheets whose models the AD names.

- [TCDS A-762](https://openairdocs.org/tcds/A-762): The Boeing Company; names 7 of 7 models: C54E-DC, C54G-DC, C54B-DC, DC-4, C54A-DC, C54D-DC, C54-DC

## Registered aircraft it may apply to (OpenAirDocs)

Matched by airframe and engine model; the AD's applicability may narrow it by serial number, part number or equipment.

- Aircraft: 4 (4 by airframe model, 0 by engine model)
- Makers: Douglas 4

Models with the most aircraft:

- [Douglas C54D-DC](https://openairdocs.org/model/douglas-c54d-dc): 2 aircraft (airframe model)
- [Douglas C54E-DC](https://openairdocs.org/model/douglas-c54e-dc): 1 aircraft (airframe model)
- [Douglas C54G-DC](https://openairdocs.org/model/douglas-c54g-dc): 1 aircraft (airframe model)

All 3 models: https://openairdocs.org/ad/49-38-02/models.md
Every aircraft: https://openairdocs.org/ad/49-38-02/aircraft.md

Its text cites no advisory circulars or STCs.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
