# AD 60-02-05: Spar Cap

- Type: Airworthiness directive
- Status: Current
- Products: Boeing DC-6, DC-6A and DC-6B
- Published: January 16, 1960
- Superseded by: Nothing supersedes this AD
- Product type: Aircraft, Large airplane
- Registered aircraft: 17 may be affected, by airframe or engine model (OpenAirDocs)
- FAA DRS: https://drs.faa.gov/browse/excelExternalWindow/83285EAA03DD45DD862569BC00729D4B.0001
- DRS record last changed: May 30, 2024
- Page: https://openairdocs.org/ad/60-02-05

## The airworthiness directive

60-02-05 DOUGLAS: Amdt. 84 Part 507 Federal Register January 16, 1960. Applies to the Following Aircraft: DC-6 Serial Numbers 42878, 43030 To 43033 Inclusive, 43136, 43148 To 43151 Inclusive, 43212 To 43214 Inclusive, and 43216 To 43218 Inclusive.

Compliance required as indicated.

To detect cracking of the lower front and center spar cap tangs at intersection with lower fuselage attach angle the following must be accomplished on affected DC-6 aircraft having in excess of 16,000 hours service time.

  (a) Inspect lower front spar cap at the nearest maintenance inspection period to 200 hours service time unless similar inspection has been conducted within the last 1,250 hours service time.

  (b) Inspect lower front and center spar caps at maintenance inspection period nearest to each succeeding 1,250 hours service time.

  (1) At the first 1,250-hour inspection period, the holes located in aft tang of front spar lower cap and fuselage attach angle should be enlarged and new attachments installed. (Kit "A" of Douglas SB A-845 or equivalent.)

  (2) At next regularly scheduled overhaul period, the holes located in forward tang of front spar lower cap should be enlarged and new attachments installed. (Kit "A" of Douglas SB A-845 or equivalent.)

  (c) If spar cap cracks are found, temporary rework per Drawing No. 3645935 (Kit "B"), or permanent rework per Drawing No. 5765079 (Kit "C") or equivalent, must be accomplished. If temporary rework is installed, inspection must be repeated at 1,250-hour intervals for a maximum of 3,200 hours service time, at which time permanent rework per Drawing No. 5765079 (Kit "C"), or equivalent, must be accomplished.

  (d) All aircraft must have permanent rework per Drawing No. 5765079 (Kit "C"), or equivalent, accomplished within next 6,400 hours service time.

  (e) After installation of permanent rework per Kit "C", or equivalent, operators may revert to normal repetitive inspection periods not to exceed 3,200 hours service time.

(Douglas Service Bulletin DC-6 No. A-845 dated July 31, 1959, covers this same subject.)

## Affected data sheets (3) (OpenAirDocs)

The type certificate data sheets whose models the AD names.

- [TCDS 6A3](https://openairdocs.org/tcds/6A3): The Boeing Company; names 1 of 3 models: DC-6A
- [TCDS 6A4](https://openairdocs.org/tcds/6A4): The Boeing Company; names 1 of 2 models: DC-6B
- [TCDS A-781](https://openairdocs.org/tcds/A-781): The Boeing Company; names 1 of 1 models: DC-6

## Registered aircraft it may apply to (OpenAirDocs)

Matched by airframe and engine model; the AD's applicability may narrow it by serial number, part number or equipment.

- Aircraft: 17 (17 by airframe model, 0 by engine model)
- Makers: Douglas 17

Models with the most aircraft:

- [Douglas DC-6B](https://openairdocs.org/model/douglas-dc-6b): 9 aircraft (airframe model)
- [Douglas DC-6A](https://openairdocs.org/model/douglas-dc-6a): 7 aircraft (airframe model)
- [Douglas DC-6](https://openairdocs.org/model/douglas-dc-6): 1 aircraft (airframe model)

All 3 models: https://openairdocs.org/ad/60-02-05/models.md
Every aircraft: https://openairdocs.org/ad/60-02-05/aircraft.md

Its text cites no advisory circulars or STCs.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
