# Service difficulty reports: N198SY

A list on [N198SY](https://openairdocs.org/aircraft/N198SY.md).

Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.

- [SDR SWIA2026022575350](https://openairdocs.org/sdr/SWIA2026022575350.md): Seat Track · corroded · Feb 5, 2026 · N198SY · Emb ERJ170200LR · Fuselage, Seat/Cargo Attach Fittings
  > RT INBD PASSENGER CABIN SEAT TRACK CORRODED BETWEEN FR 83-85. REMOVED AND REPLACED SEAT TRACK SPLICE IAW ETD2022-170-022163, REV C.
- [SDR SWIA2026020475352](https://openairdocs.org/sdr/SWIA2026020475352.md): Skin · damaged · Feb 4, 2026 · N198SY · Emb ERJ170200LR · Fuselage Main, Plate/Skin
  > FWD FUSELAGE HAS LIGHTNING DAMAGED SKIN BETWEEN FR 7-8, BETWEEN STGR 12L-13L. CUT OUT DAMAGE SECTION OF FWD FUSELAGE SKIN BETWEEN FR 7-8, STGR 12L-13L TO REMOVE LIGHTNING STRIKE. INSTALLED DOUBLER/TRIPLER REPAIR ON FWD FUSELAGE SKIN BETWEEN FR 7-8, STGR 12L-
- [SDR SWIA2026020475351](https://openairdocs.org/sdr/SWIA2026020475351.md): Skin · damaged · Feb 4, 2026 · N198SY · Emb ERJ170200LR · Fuselage Main, Plate/Skin
  > CENTER FUSELAGE EXTERNAL SKIN HAS EVIDENCE OF A LIGHTNING STRIKE AT FRAME 33-44, STGR 14R-15R. REPAIRED LIGHTNING STRIKE BETWEEN FRAMES 33-34, STRINGERS 14R-15R BY CUTTING OUT DAMAGED AREA AND THEN INSTALLING A FABRICATED FILLER, INNER DOUBLER, AND OUTER DOUB
- [SDR SWIA2026020375353](https://openairdocs.org/sdr/SWIA2026020375353.md): Skin · damaged · Feb 3, 2026 · N198SY · Emb ERJ170200LR · Fuselage Main, Plate/Skin
  > FWD FUSELAGE EXTERNAL SKIN HAS EVIDENCE OF LIGHTNING STRIKE AT FR 2 STGR 20L. REPAIRED LIGHTNING STRIKE DAMAGE AT FRAME 2, BETWEEN STRINGERS 23L-24L BY DRILLING THE FUSELAGE EXTERNAL SKIN TO SIZE AND INSTALLING A FREEZE PLUG REF ETD2026-170-002533 REV. B.
- [SDR SWI2025F01120](https://openairdocs.org/sdr/SWI2025F01120.md): Windshield · cracked · Aug 23, 2025 · N198SY · Emb ERJ170200LR · Flight Compartment Windows
  > ON FINAL APPROACH TO SLC, RIGHT FRONT WINDOW SHATTERED. (FLIGHT 3331 - FILED CLOSED) THIS DISCREPANCY WAS TRANSFERRED TO CAMP ITEM 30719913 WITH THE FOLLOWING CORRECTIVE ACTION: "REMOVED AND REPLACED COPILOT WINDSHIELD IN REFERENCE TO AMM 56-11-00. OPS CHECK
- [SDR SWIA2023111029](https://openairdocs.org/sdr/SWIA2023111029.md): Unknown · corroded · Oct 29, 2023 · N198SY · Emb ERJ170200LR · Aerodynamic Fairings
  > CENTER BELLY FAIRING RACK: PNL 192CR CORRODED AT MOUNTING DOUBLER. (C-CHECK RO 11/13/2023) DOUBLER FOUND TO BE CORRODED THROUGH, REMOVED AND REPLACED DOUBLER PER SRM 51-40-08
- [SDR SWIA20231110026](https://openairdocs.org/sdr/SWIA20231110026.md): Unknown · corroded · Oct 26, 2023 · N198SY · Emb ERJ170200LR · Fuselage, Seat/Cargo Attach Fittings
  > CENTER FUSELAGE III PASSENGER CABIN FLOOR STRUCTURES FR 84-85 STGR17 RH INNER SEAT TRACK AND BEAM HAVE CORROSION. (C-CHECK RO 11/13/2023) PERFORMED SEAT TRACK SPLICE AT FR 84-85 ON RH SEAT TRACK. REF ETD2023-170-027452. THIS REPAIR DOES NOT EFFECT WEIGHT A
- [SDR SWIA202053998](https://openairdocs.org/sdr/SWIA202053998.md): Drain · cracked · Nov 9, 2020 · N198SY · Emb ERJ170200LR · Fuselage Floor Panel
  > AFT GALLEY FLOORBOARD 251HLF FORWARD FLOOR DRAIN THREADED CROSSBAR IS CRACKED. C-CHECK 11/12/2020. INSTALLED A NEW THREADED CROSSBAR TO AFT GALLEY FLOORBOARD 251HLF FORWARD FLOOR DRAIN, REF E175 AMM.
- [SDR SWIA202053997](https://openairdocs.org/sdr/SWIA202053997.md): Fitting · broken · Nov 9, 2020 · N198SY · Emb ERJ170200LR · Emergency Equipment
  > FWD SERVICE DOOR, FWD FLOOR SLIDE FITTING SPRING BROKEN. C-CHECK 11/12/2020. REMOVED AND REPLACED FWD SERVICE DOOR, FWD FLOOR SLIDE FITTING SPRING, REF AMM.
- [SDR SWIA202053995](https://openairdocs.org/sdr/SWIA202053995.md): Drain · broken · Nov 8, 2020 · N198SY · Emb ERJ170200LR · Fuselage Floor Panel
  > FORWARD GALLEY FLOORBOARD 226BRF FLOOR DRAIN THREADED CROSSBAR IS BROKEN OFF. C-CHECK 11/12/2020. INSTALLED A NEW THREADED CROSSBAR TO FORWARD GALLEY FLOORBOARD 226BRF FLOOR DRAIN, REF E175 AMM.
- [SDR SWIA202053994](https://openairdocs.org/sdr/SWIA202053994.md): Drain · broken · Nov 8, 2020 · N198SY · Emb ERJ170200LR · Fuselage Floor Panel
  > FORWARD GALLEY FLOORBOARD 225CLF AFT FLOOR DRAIN THREADED CROSSBAR IS BROKEN OFF. C-CHECK 11/12/2020. INSTALLED A NEW THREADED CROSSBAR TO THE FORWARD GALLEY FLOORBOARD 225CLF AFT FLOOR DRAIN, REF E175 AMM.
- [SDR SWIA202053993](https://openairdocs.org/sdr/SWIA202053993.md): Insert · broken · Nov 6, 2020 · N198SY · Emb ERJ170200LR · Fuselage Floor Panel
  > FLOOR PANEL 241CLF HAS BROKEN INSERTS. C-CHECK 11/12/2020. REMOVED AND REPLACED ALL BROKEN PASS THRU INSERTS ON PANEL 241CLF, IN REFERENCE TO AMM.
- [SDR SWIA202053992](https://openairdocs.org/sdr/SWIA202053992.md): Insert · broken · Nov 6, 2020 · N198SY · Emb ERJ170200LR · Fuselage Floor Panel
  > FLOOR PANEL 241ALF HAS BROKEN INSERTS. C-CHECK 11/12/2020. REMOVED AND REPLACED ALL BROKEN PASS THRU INSERTS ON PANEL 241ALF, IN REFERENCE TO AMM.
- [SDR SWIA202053991](https://openairdocs.org/sdr/SWIA202053991.md): Scuff Plate · deteriorated · Nov 4, 2020 · N198SY · Emb ERJ170200LR · Galley Doors
  > FORWARD SERVICE DOOR SCUFF PLATE HAS BARE COMPOSITE DAMAGE ON AFT UPPER INTERNAL CORNER OF THE DOOR CUTOUT. C-CHECK 11/12/2020. RESTORED SURFACE PROTECTION TO FORWARD SERVICE DOOR SCUFF PLATE AFT UPPER INTERNAL CORNER OF THE DOOR CUTOUT, REF EMB SRM.
- [SDR SWIA202053990](https://openairdocs.org/sdr/SWIA202053990.md): Stop Fitting · broken · Nov 4, 2020 · N198SY · Emb ERJ170200LR · Passenger/Crew Doors
  > FORWARD PASSENGER DOOR CUTOUT DOOR STOP HAS BROKEN SAFETY WIRE IN THE FOLLOWING LOCATION: AFT EDGE FROM THE TOP, DOOR STOP NR 6. C-CHECK 11/12/2020. REMOVED AND REPLACED FORWARD PASSENGER DOOR CUTOUT DOOR STOP SAFETY WIRE IN THE FOLLOWING LOCATION: AFT EDGE
- [SDR SWIA202053989](https://openairdocs.org/sdr/SWIA202053989.md): Seal Rest · chafed · Nov 4, 2020 · N198SY · Emb ERJ170200LR · Passenger/Crew Doors
  > FORWARD PASSENGER DOOR CUTOUT, SEAL RESTS HAVE 9 AREAS AROUND THE CIRCUMFERENCE THAT HAVE CHAFE DAMAGE/BARE METAL. C-CHECK 11/12/2020. REMOVED 9 AREAS OF CHAFING FROM FORWARD PASSENGER DOOR CUTOUT, SEAL RESTS AND RESTORED SURFACE PROTECTION, REF SRM.

## The whole list in SQL

Runs in DuckDB 1.2 or later on the release's Parquet files over HTTPS:

```sql
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
WHERE n_number = 'N198SY' AND registry_match = 'registration'
ORDER BY difficulty_date DESC
```

This list as a web page: https://openairdocs.org/aircraft/N198SY/reports

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
