# SDR 0002741160

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 28, 2000
- Submitted: August 10, 2000
- Operation: Air carrier
- Aircraft: [N160US](https://openairdocs.org/aircraft/N160US), registered now
- Make and model: Doug DC-10-40
- Registry model: [Doug DC-10-40](https://openairdocs.org/model/douglas-dc-10-40) (OpenAirDocs)
- Aircraft serial: 46769
- Aircraft time: 75,284 hours, 26,431 cycles
- System (JASC): [2910 · Hydraulic System, Main](https://openairdocs.org/jasc/2910)
- Part: Line
- Condition: Leaking
- Location: Hyd System
- Stage of operation: TO
- How discovered: O
- Nature of condition: K, J
- Precautionary procedure: C
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/0002741160

## Discrepancy

ABORTED TAKEOFF AT 80 KNOTS DUE TO COMPLETE LOSS OF NR 1 HYDRAULIC SYSTEM.  REPAIRED LEAKING NR 1 SYSTEM BRAKE RETURN LINE.  REPLACED BOTH NR 1 SYSTEM ENGINE DRIVEN PUMP.  OPERATIONAL CHECK OK.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
