# SDR 02FDEA00337

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 16, 2002
- Submitted: May 17, 2002
- Operation: Air carrier
- Aircraft: [N308FE](https://openairdocs.org/aircraft/N308FE), registered now
- Make and model: Doug DC-10-30
- Registry model: [Doug DC-10-30](https://openairdocs.org/model/mcdonnell-douglas-dc-10-30) (OpenAirDocs)
- Aircraft serial: 48297
- Aircraft time: 41,502 hours, 12,482 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Valve
- Condition: Failed
- Location: Pneumatic Sys
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/02FDEA00337

## Discrepancy

ON CLIMB NR 2 PNEU TEMP HI LIGHT ILLUM'D.  SHUTDOWN PNEU SUPPLY SEL.  PERFORMED RED TAB PROC.  REMOVED AND REPLACED THE NR 3 PACK FLOW VALVE AND THE NR 1 PNEU PRESS REGULATOR VALVE.  ALL CHECK OK.

---