# SDR 1179596CK

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 13, 1995
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: N96CK
- Make and model: Lear 23LEAR
- Aircraft serial: 23016
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Hose
- Condition: Deteriorated
- Location: Under Brkr Panel
- Part time: 6,695 hours
- Stage of operation: CR
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/1179596CK

## Discrepancy

IN-FLIGHT MAIN DC CIRCUIT BREAKERS TRIPPED.  CIRCUIT BREAKER PANEL WAS HOT TO TOUCH.  BREAKERS WERE RESET AND A NORMAL LANDING MADE.  INSPECTION OF ELECTRICAL SYSTEM AND CIRCUIT BREAKER PANEL REVEALED NO DEFECTS.  A BLEED AIR HOSE UNDER THE PANEL WAS FOUND TO HAVE SEVERAL SMALL HOLES IN IT CAUSING THE PANEL TO OVERHEAT.  HOSE WAS REPLACED.  RECOMMEND INSTALLING INSULATION.  (X)

---