# SDR 12082005

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 8, 2005
- Submitted: December 9, 2005
- Operation: Air carrier
- Aircraft: [N518QS](https://openairdocs.org/aircraft/N518QS), registered now
- Make and model: Gulstm GV
- Aircraft serial: 5075
- Aircraft time: 95 hours, 51 cycles
- System (JASC): [3310 · Flight Compartment Lighting](https://openairdocs.org/jasc/3310)
- Part: Odor
- Condition: Detected
- Location: Cockpit
- Stage of operation: AP
- How discovered: O
- Nature of condition: B
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/12082005

## Discrepancy

BURNING SMELL IN COCKPIT.  MAINTENANCE FOUND SPIRAL WRAP TOUCHING PILOTS MAP LIGHT ASSEMBLY AND OVERHEATING.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
