# SDR 2005FA0000583

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 22, 2005
- Submitted: April 25, 2005
- Operation: General aviation
- Aircraft: [N6028Y](https://openairdocs.org/aircraft/N6028Y), registered now
- Make and model: Beech C90A
- Registry model: [Beech C90A](https://openairdocs.org/model/beech-c90a) (OpenAirDocs)
- Aircraft serial: LJ1728
- Aircraft time: 71 hours, 53 cycles
- System (JASC): [2822 · Fuel Boost Pump](https://openairdocs.org/jasc/2822)
- Part: Switch
- Part number: MS2465823D
- Condition: Overheated
- Location: Cockpit
- Part time: 71 hours, 53 cycles
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/2005FA0000583

## Discrepancy

DISCREPANCY ORIGINALLY AN INOPERATIVE LT BOOST PUMP. DURING THE OPS CHECK OF  REPLACEMENT BOOST PUMP, SWITCH WAS NOTED TO BE INTERMITTENT. AFTER GAINING ACCESS TO SWITCH TERMINALS BY REMOVING THE LT FUEL BOOST PUMP SWITCH, TERMINALS WERE FOUND IN AN OVERHEATED CONDITION, CONNECTIONS WERE LOOSE. SWITCH AND TERMINALS WERE REPLACED REMAINING SWITCHES, CB WERE INSPECTED, OTHER CONNECTIONS WERE ALSO FOUND LOOSE RT SIDE CB PANEL WAS ALSO REMOVED, ELEC COMPONENTS WERE ALSO INSPECTED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
