# SDR 2015FA0000051

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 28, 2015
- Submitted: February 2, 2015
- Operation: General aviation
- Make and model: Cirrus SR20
- Registry model: [Cirrus SR20](https://openairdocs.org/model/cirrus-design-sr20) (OpenAirDocs)
- Aircraft time: 990 hours
- Engine: Cont IO360ES
- Engine time: 990 hours
- System (JASC): [7414 · Magneto/Distributor](https://openairdocs.org/jasc/7414)
- Part: Magneto
- Part number: 105005563
- Part serial: D13IA185
- Condition: Contaminated
- Location: Zone 400
- Part time: 496 hours
- Stage of operation: IN
- How discovered: V
- Nature of condition: C
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/2015FA0000051

## Discrepancy

A STONE WAS FOUND IN THE MAGNETO HOUSING DURING ITS FIRST 500 HOURS INSPECTION.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
