# SDR 2020FA0000125

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 12, 2019
- Submitted: February 4, 2020
- Operation: General aviation
- Filed by: [Western Skyways Inc, repair station WS9R575J](https://openairdocs.org/faa-repair-station/WS9R575J/western-skyways-inc.md) (OpenAirDocs)
- System (JASC): [7414 · Magneto/Distributor](https://openairdocs.org/jasc/7414)
- Part: Mount
- Condition: Failed
- Location: Magneto
- Component: Magneto
- Component part number: BL3493505
- Stage of operation: NR
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/2020FA0000125

## Discrepancy

FACTORY REBUILT CONTINENTAL MOTORS INC. MAGNETO FAILED PRIOR TO FIRST FLIGHT.  MAGNETO INSTALLED DURING THE ENGINE OVERHAUL.  TEST CELL AND GROUND RUNS IN ACFT SATISFACTORY BUT FAILED PRIOR TO THE FIRST FLIGHT.  SUSPECT POINTS FAILURE.  THIS REPAIR STATION HAS EXPERIENCED 2 PREVIOUS CONFIRMED MAGS WITH FAILED POINTS, BOTH ON CONTINENTAL FACTORY REBUILDS.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
