# SDR 2026FA0000226

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 17, 2025
- Submitted: March 26, 2026
- Operation: General aviation
- Make and model: Cessna 150
- Registry model: [Cessna 150](https://openairdocs.org/model/cessna-150) (OpenAirDocs)
- Aircraft time: 3,600 hours
- System (JASC): [7414 · Magneto/Distributor](https://openairdocs.org/jasc/7414)
- Part: Magneto
- Part number: 4301
- Part serial: 92070076
- Condition: Failed
- Location: Engine
- Part time: 700 hours
- Stage of operation: LD
- How discovered: O
- Nature of condition: R
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/2026FA0000226

## Discrepancy

WHILE REDUCING POWER ON LANDING, ENG RAN VERY ROUGH.  AFTER LANDING MAGNETO CHECK CAUSE LARGE DROP IN RPMS ON BOTH MAGS.  MECHANICS FIRST REPAIRED INDUCTION LEAK WHICH DID NOT SOLVE MAG DROP.  THEN THEY CHANGED THE CARBURETOR WHICH DID NOT SOLVE PROBLEM, THEN THEY SENT BOTH MAGNETOS IN FOR REBUILDING.  THEY CHANGED A LOT OF PARTS IN THE MAGS AND THEN PLANE OPS SATISFACTORILY. THIS DUAL MAGNETO FAILURE IS A SAFETY OF FLIGHT ISSUE.  THESE MAGS WERE REBUILT APPROXIMATELY 400 HRS BEFORE THEIR FAILURE BY AN FAA APPROVED REPAIR STATION.  THERE IS A REQUIREMENT THAT THEY BE INSPECTED EVERY 500 HS FOR CERTAIN OPERATORS.  THIS INCORRECTLY IMPLIES THAT THEY SHOULD PROVIDE SAFE SERVICE UNTIL THE 500 HR INSPECTION IS DUE.  WHEN TWO MAGS FAIL AFTER 400 HRS OF SERVICE, THIS 500 HR INSPECTION SHOULD BE REDUCED TO PERHAPS 300 HOURS OF OPS & SERVICE BULLETINS & AIRWORTHINESS DIRECTIVES ISSUED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
