# SDR 39LA20150823141

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 23, 2015
- Submitted: August 24, 2015
- Operation: Air carrier
- Aircraft: [N803AR](https://openairdocs.org/aircraft/N803AR), registered now
- Make and model: Skrsky S61N
- Aircraft serial: 61761
- Aircraft time: 11,630 hours, 20,956 cycles
- Engine: Ge CT581402
- System (JASC): [2497 · Electrical Power System Wiring](https://openairdocs.org/jasc/2497)
- Part: Elec Connector
- Part number: MS3476W1626S
- Condition: Shorted
- Stage of operation: CR
- How discovered: O
- Nature of condition: B, J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/39LA20150823141

## Discrepancy

DURING CRUISE THE FLIGHT CREW NOTICED AN ODOR THAT SMELLED LIKE AN ELEC FIRE.  THE MASTER CAUTION FOR THE NR ONE GEN ILLUMINATED WITH THE AFCS SIMULTANEOUSLY SHUTTING OFF SHORTLY AFTER THE ODOR.  RE-ENGAGED THE AFCS, THE NR ONE GEN WOULD NOT RESET.  THE EMER CHECKLIST WAS ACCOMPLISHED & A NORMAL LANDING WAS PERFORMED.  REPLACED CONNECTOR PN MS3476W16-26S WITH NEW.  REMOVED AC VOLTAGE REGULATOR PN 21B17-10, SN 1003 & INSTALLED SAME PN SN 767 IAW SA4045-80 CHAPTER 24-20-2 & SA4045-81B - S6188-07010.  ALL OPERATIONS CHECKED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
