# SDR 3EJAN631RP062126

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 21, 2026
- Submitted: August 14, 2026
- Operation: Air carrier
- Aircraft: [N631RP](https://openairdocs.org/aircraft/N631RP), registered now
- Make and model: Bombdr BD1001A10
- Aircraft serial: 20784
- Aircraft time: 2,411 hours, 1,242 cycles
- System (JASC): [3620 · Pneumatic Indicating System](https://openairdocs.org/jasc/3620)
- Part: Seal
- Part number: A02501029
- Condition: Worn
- Location: Zone 100
- Part time: 2,411 hours, 1,242 cycles
- Stage of operation: CL
- How discovered: O
- Nature of condition: K, J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/3EJAN631RP062126

## Discrepancy

L BLEED LEAK RED CAS MESSAGE. RAN CHECKLIST AND LIGHT EVENTUALLY EXTINGUISHED.   REMOVED AND REPLACED SEALS FOR BOTH PACK FLOW CONTROL VALVE. FOUND BLEED LEAK REPORT POINTS TO AREA AROUND
LEFT-INTERMEDIATE VALVE. FOUND VALVE LEAKING REINSTALLED INBD CLAMP. PERFORMED OPS AND LEAK CHECK, CHECKS GOOD IAW AMM 36-11-05-04

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
