# SDR 9500319102

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 6, 1995
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: [N92S](https://openairdocs.org/aircraft/N92S), registered now
- Make and model: Doug DC-9-15
- Registry model: [Doug DC-9-15](https://openairdocs.org/model/mcdonnell-douglas-dc-9-15) (OpenAirDocs)
- Aircraft serial: 47063
- Engine: Pwa JT8D7
- System (JASC): [7711 · Engine Pressure Ratio (EPR)](https://openairdocs.org/jasc/7711)
- Part: Pt7 Tube
- Condition: Broken
- Location: Rt Engine
- Stage of operation: CL
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/9500319102

## Discrepancy

ON TAKEOFF, THE NR 2 EPR WAS .2 BELOW NR 1 WITH OTHER PARAMETERS MATCHED.  AIRCRAFT RETURNED TO DTW AND LANDED WITHOUT INCIDENT.  THE EPR TRANSMITTER WAS REPLACED.  A BROKEN PT7 TUBE WAS FOUND BETWEEN THE 2 O'CLOCK AND 4 O'CLOCK PROBES.  REPLACED THE PT7 TUBE.  ENGINE RUN-UP CHECKED OK.  AIRCRAFT RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
