# SDR 9508109863

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 20, 1995
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: N772NC
- Make and model: Doug DC-9-51
- Registry model: [Doug DC-9-51](https://openairdocs.org/model/mcdonnell-douglas-dc-9-51) (OpenAirDocs)
- Aircraft serial: 47773
- Engine: Pwa JT8D17
- System (JASC): [7711 · Engine Pressure Ratio (EPR)](https://openairdocs.org/jasc/7711)
- Part: Epr Indication
- Condition: Malfunctioned
- Location: Nr 2 Engine
- Stage of operation: TO
- Nature of condition: N
- Precautionary procedure: C, D
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/9508109863

## Discrepancy

ON TAKEOFF, THE NR 2 ENGINE EPR INDICATION HUNG AT 1.7.  THE TAKEOFF WAS ABORTED AND THE AIRCRAFT RETURNED TO THE GATE.  MAINTENANCE REPLACED THE EPR TRANSMITTER AND INDICATOR.  DURING RUNUP THE SYSTEM CHECKED OK.  THE AIRCRAFT RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
