# SDR 95FDEA00279

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 15, 1995
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: N498FE
- Make and model: Boeing 727232
- Aircraft serial: 20867
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Coupling
- Condition: Leaking
- Location: Nr 1 Bleed
- Stage of operation: CR
- Nature of condition: J
- Precautionary procedure: H
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/95FDEA00279

## Discrepancy

YMX:  AFTER ABOUT 1 HR INTO FLT, LWR AFT BODY OVERHEAT LIGHT CAME ON PERFORMED ABNORMAL CHECKLIST, LIGHT WENT OUT.  PROCEDURE STATED LEAK IS BETWEEN BLEED VALVE AND PACK VALVE.  (PROBLEM NR 1 BLEED).  REMOVED AND REPLACED COUPLING ASSY (ON LINE GOING TO PURGE VALVE) ON LT AIR CLEANER DUE TO LEAKING.  LEAK CHECK C/O AND SYSTEM FOUND SERVICEABLE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
