# SDR 95ZZZX3262

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 6, 1995
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: [N36MR](https://openairdocs.org/aircraft/N36MR), registered now
- Make and model: Bnorm BN2A26
- Aircraft serial: 900
- Engine: Lyc O540E4C5
- System (JASC): [7414 · Magneto/Distributor](https://openairdocs.org/jasc/7414)
- Part: Bushing
- Condition: Loose
- Location: Impulse Coupling
- Part time: 1,122 hours
- Stage of operation: IN
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/95ZZZX3262

## Discrepancy

DURING COMPLIANCE OF AD78-09-07R3, MAGNETO IMPULSE COUPLING INSPECTION, DISCOVERED THAT PREVIOUS COMPLIANCE WITH LYCOMING SI NR 114D, THE MAGNETO DRIVE BUSHING HAD WORKED LOOSE.  FABRICATED AND RE-INSTALLED NEW BUSHING IAW LYCOMING SI NR 1140.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
