# SDR 9600509878

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 1, 1996
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: N787NC
- Make and model: Doug DC-9-51
- Registry model: [Doug DC-9-51](https://openairdocs.org/model/mcdonnell-douglas-dc-9-51) (OpenAirDocs)
- Aircraft serial: 48149
- Engine: Pwa JT8D17
- System (JASC): [7320 · Fuel Controlling System](https://openairdocs.org/jasc/7320)
- Part: Fuel Contl Syst
- Condition: Out Of Adjust
- Location: Nr 1 Engine
- Stage of operation: TO
- Nature of condition: R
- Precautionary procedure: C, D
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/9600509878

## Discrepancy

NR 1 ENGINE WOULD NOT DEVELOP TARGET EPR FOR TAKEOFF.  THE TAKEOFF WAS ABORTED AND THE AIRCRAFT RETURNED TO THE GATE.  MAINTENANCE TRIMMED THE ENGINE AND SUBSEQUENT RUNUP WAS SATISFACTORY.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
