# SDR 96ZZZX1049

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 31, 1996
- Submitted: March 26, 2000
- Operation: General aviation
- Aircraft: N7585X
- Make and model: Cessna R172K
- Registry model: [Cessna R172K](https://openairdocs.org/model/cessna-r172k) (OpenAirDocs)
- Aircraft serial: R1723334
- System (JASC): [6122 · Propeller Governor](https://openairdocs.org/jasc/6122)
- Part: Control Assy
- Part number: C299506B0104
- Condition: Frozen
- Location: Prop Gov
- Part time: 2 hours
- Component: Mcauly, C290D3
- Stage of operation: IN
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/96ZZZX1049

## Discrepancy

INSTALLED NEW CONTROL CABLE ASSY AS SUPPLIED BY CESSNA AIRCRAFT.  INSTALLED AND RIGGED PER CESSNA R172K SERVICE MANUAL.  ALL OPS CHECK OK ON GROUND PRIOR TO FLIGHT.  RUN-UP OPS CHECK OK.  FLOWN FOR 2.0 HOURS FOR ENGINE BREAK-IN.  ALL OPS NORMAL.  UPON RETURN TO GROUND.  OPS CHECK OF ENGINE CONTROLS REVEALED FROZEN SOLID GOVERNOR CONTROL CABLE ASSY.  CABLE NR 1 RETURNED TO CESSNA FOR EVALUATION.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
