# SDR 9717099963

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 7, 1997
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: N913RW
- Make and model: Doug DC-9-31
- Registry model: [Doug DC-9-31](https://openairdocs.org/model/douglas-dc-9-31) (OpenAirDocs)
- Aircraft serial: 47171
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Pneu Valve
- Part number: 3281221
- Condition: Leaking
- Location: Right
- Part time: 34,616 hours
- Stage of operation: CL
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/9717099963

## Discrepancy

TAIL COMPARTMENT TEMPERATURE HIGH LIGHT ILLUMINATED AFTER TAKEOFF.  CREW DECLARED AN EMERGENCY AND RETURNED TO BNA, AIRCRAFT LANDED WITHOUT INCIDENT.  MAINTENANCE FOUND LEAKING CROSSFEED PNEUMATIC VALVE IN RIGHT SYSTEM.  REPLACED VALVE AND TEMPERATURE SENSOR, OPERATIONAL CHECK NORMAL.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
