# SDR 9805039942

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 27, 1998
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: N3991C
- Make and model: Doug DC-9-32
- Registry model: [Doug DC-9-32](https://openairdocs.org/model/mcdonnell-douglas-dc-9-32) (OpenAirDocs)
- Aircraft serial: 47175
- Engine: Pwa JT8D15
- System (JASC): [7711 · Engine Pressure Ratio (EPR)](https://openairdocs.org/jasc/7711)
- Part: Transmitter
- Part number: LG80A2
- Condition: Malfunctioned
- Location: Lt Engine
- Part time: 8,087 hours
- Stage of operation: TO
- Nature of condition: N
- Precautionary procedure: C, D
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/9805039942

## Discrepancy

AS TAKEOFF POWER WAS APPLIED, THE LEFT ENGINE EPR INDICATION FROZE AT 1.7.  CREW ABORTED TAKEOFF AND RETURNED TO THE GATE.  MAINTENANCE REPLACED THE LEFT ENGINE EPR TRANSMITTER, ENGINE OPERATIONAL CHECK OK.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
