# SDR 99ZZZX1990

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 17, 1999
- Submitted: March 26, 2000
- Operation: General aviation
- Filed by: [Charles City Aeronautics Inc, repair station CQVR964C](https://openairdocs.org/faa-repair-station/CQVR964C/charles-city-aeronautics-inc.md) (OpenAirDocs)
- Make and model: Piper PA-23-250
- Registry model: [Piper PA-23-250](https://openairdocs.org/model/piper-pa-23-250) (OpenAirDocs)
- System (JASC): [2810 · Fuel Storage](https://openairdocs.org/jasc/2810)
- Part: Fuel Cap
- Condition: Failed
- Location: Fuel Cell
- Stage of operation: IN
- Nature of condition: W
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/99ZZZX1990

## Discrepancy

SUBMITTER STATED THESE FUEL CAPS FAILED IN A TIME FRAME ANYWHERE FROM 2 WEEKS TO APPROXMATELY 2 MONTHS.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
