# SDR AALA20100130TUL02

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 30, 2010
- Submitted: August 20, 2010
- Operation: Air carrier
- Aircraft: N424AA
- Make and model: Doug DC-9-82
- Registry model: [Doug DC-9-82](https://openairdocs.org/model/mcdonnell-douglas-dc-9-82) (OpenAirDocs)
- Aircraft serial: 49336
- Aircraft time: 67,879 hours, 36,346 cycles
- System (JASC): [5322 · Fuselage Internal Mounting Structure](https://openairdocs.org/jasc/5322)
- Part: Shear Tie
- Condition: Corroded
- Location: Fuselage
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/AALA20100130TUL02

## Discrepancy

SHEAR TIE AFT SIDE STATION 1322 BETWEEN LONGERON 29 LEFT AND LONGERON 29 RIGHT HAS CORROSION.  INSTALLED SHEAR TIE AT STATION 1322 BETWEEN LONGERON 29 AND LONGERON 29 RIGHT PER SRM 53-04 FIGURE 38 VIEW G.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
