# SDR AALA201704249001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 4, 2017
- Submitted: April 24, 2017
- Operation: Air carrier
- Aircraft: [N717UW](https://openairdocs.org/aircraft/N717UW), registered now
- Make and model: Airbus A319-112
- Registry model: [Airbus A319-112](https://openairdocs.org/model/airbus-industrie-a319-112) (OpenAirDocs)
- Aircraft serial: 1069
- Aircraft time: 48,848 hours, 28,558 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Floor Support
- Part number: D53472172204
- Condition: Corroded
- Location: Frames 66-68
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/AALA201704249001

## Discrepancy

CORROSION ON AFT GALLEY FLOOR SUPPORT AT Y1225 BETWEEN FRAME 66 AND 68.  REPLACED THE FLOOR SUPPORT IAW SRM 51-72-11, AND DRAWING D53472780.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
