# SDR AALA201808319026

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 30, 2018
- Submitted: August 31, 2018
- Operation: Air carrier
- Aircraft: [N933AN](https://openairdocs.org/aircraft/N933AN), registered now
- Make and model: Boeing 737823
- Aircraft serial: 30080
- Aircraft time: 54,418 hours, 22,234 cycles
- System (JASC): [2822 · Fuel Boost Pump](https://openairdocs.org/jasc/2822)
- Part: Relay
- Condition: Defective
- Location: Fuel Pump
- Stage of operation: NR
- How discovered: 9
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/AALA201808319026

## Discrepancy

LEFT CENTER FUEL PUMP LOW PRESSURE LIGHT ILLUMINATED AFTER TAKEOFF.  THE AIRCRAFT WAS GROUNDED.  REPLACED LEFT CENTER POWER SWITCHING RELAY IAW WDM 28-23-11.  OPS CHECKED OK IAW AMM 28-22-00. OK FOR SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
