# SDR AALA202205050653

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 3, 2022
- Submitted: May 5, 2022
- Operation: Air carrier
- Aircraft: [N534UW](https://openairdocs.org/aircraft/N534UW), registered now
- Make and model: Airbus A300*
- Aircraft serial: 3989
- Aircraft time: 43,500 hours, 15,995 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Floor Panel
- Condition: Delaminated
- Location: Zone 100 - Fuse
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/AALA202205050653

## Discrepancy

AIRCRAFT WAS GROUNDED: AFT CARGO COMPARTMENT FLOOR PANEL 151GF DELAMINATED. REPLACED FLOOR PANEL PER AMM 53-42-14.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
