# SDR ABXA000297

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 13, 2000
- Submitted: June 14, 2000
- Operation: Air carrier
- Aircraft: N960AX
- Make and model: Doug DC-9-41
- Registry model: [Doug DC-9-41](https://openairdocs.org/model/douglas-dc-9-41) (OpenAirDocs)
- Aircraft serial: 47762
- Aircraft time: 34,622 hours, 39,572 cycles
- System (JASC): [2440 · External Power System](https://openairdocs.org/jasc/2440)
- Part: Receptacle
- Part number: 2550
- Condition: Burned
- Location: Fuselage
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/ABXA000297

## Discrepancy

DURING LINE OPERATION WHILE CONNECTING GROUND EXTERNAL POWER, CREW REPORTED SPARKS AND SMOKE COMING FROM EXTERNAL POWER RECEPTACLE WHEN GROUND POWER CART WAS CONNECTED AND POWER APPLIED.  REPLACED EXTERNAL POWER RECEPTACLE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
