# SDR AMCR200500006

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 21, 2005
- Submitted: July 22, 2005
- Operation: General aviation
- Filed by: [Alticor Inc, repair station AMCR163C](https://openairdocs.org/faa-repair-station/AMCR163C/alticor-inc.md) (OpenAirDocs)
- Aircraft: N526AC
- Make and model: Braero BAE125800A
- Aircraft serial: 258169
- Aircraft time: 5,503 hours, 3,705 cycles
- System (JASC): [5610 · Flight Compartment Windows](https://openairdocs.org/jasc/5610)
- Part: Windshield
- Part number: 24016335
- Part serial: L314965
- Condition: Failed
- Location: Cockpit
- Part time: 2,036 hours, 1,334 cycles
- Stage of operation: CR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/AMCR200500006

## Discrepancy

CREW GOT A WINDSHIELD OVERHEAT INDICATION. UPON RETURN, CONTINUITY CHECK FOUND LEFT WINDSCREEN'S NORMAL SENSOR OPEN. REPLACED WINDSHIELD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
