# SDR ANCF20230108021

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 25, 2023
- Submitted: August 1, 2023
- Operation: Air carrier
- Aircraft: [N764AV](https://openairdocs.org/aircraft/N764AV), registered now
- Make and model: Airbus A320-251N
- Registry model: [Airbus A320-251N](https://openairdocs.org/model/airbus-a320-251n) (OpenAirDocs)
- Aircraft serial: 7887
- Aircraft time: 19,048 hours, 5,868 cycles
- Engine: Cfmint LEAP1A26
- Engine time: 12,402 hours, 6,857 cycles
- System (JASC): [2900 · Hydraulic Power System](https://openairdocs.org/jasc/2900)
- Part: Unknown
- Part number: UNKNOWN
- Condition: Unknown
- Location: Unknown
- Stage of operation: CR
- How discovered: V
- Nature of condition: J
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/ANCF20230108021

## Discrepancy

HYD G RSVR LO LVL WAS PRESENTED ON ECAM ECAM ACTIONS WAS PERFORMED.   IAW TSM 29-11-00-810-803-A WAS FOUND A LEAK COMING FROM PRESSURE PIPE IN THE GREEN HYD SISTEM IN THE NGINE PYLON,   IAW TFU 29.11.00.018 AND AMM TASK 29-11-49-000-814-A REMOVAL OF THE PRESSURE PIPE IN THE GREEN HYD SYSTEM  IN THE ENGINE PYLON WAS PERFORMED.  IAW AMM TASK 29-11-49-400-814A INSTALLATION OF GREEN HYDRAULIC  SYSTEM  IN THE ENGINE 1 PYLON WAS INSTALLED  AND IN ACCORDANCE 12-12-29-611-001 SERVICING WAS PERFORMED AND DRY MOTORING WAS ACCOMPLISHED TEST OF TRHUST REVERSER WAS SATISFACTORY.  IAW  AMM 29-00-00-870-003-A, BLEEDING PROCEDURE OF GREEN HYDRAULIC SYSTEM WAS PERFORMED SATISFACTORY.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
