# SDR ARWA0010720

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 28, 2001
- Submitted: August 2, 2001
- Operation: Air carrier
- Aircraft: N8968U
- Make and model: Doug DC-8-62
- Registry model: [Doug DC-8-62](https://openairdocs.org/model/mcdonnell-douglas-dc-8-62) (OpenAirDocs)
- Aircraft serial: 46069
- Aircraft time: 62,440 hours, 18,748 cycles
- Engine: Pwa JT3D7
- Engine time: 42,050 hours, 16,453 cycles
- System (JASC): [7510 · Engine Anti-Icing System](https://openairdocs.org/jasc/7510)
- Part: Bolt
- Part number: 361615
- Condition: Sheared
- Location: Nr 1 Engine
- Stage of operation: CR
- How discovered: O
- Nature of condition: J, B
- Precautionary procedure: E
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/ARWA0010720

## Discrepancy

DURING FL 350 AND AS CRUISE ALTITUDE, THE NR 1 ENGINE OIL PRESSURE LIGHT ILLUMINATED AND THE EGT BECAME ERRATIC.  PERFORM CHECKLIST, SHUT DOWN ENGINE AT 0819Z, OIL PRESSURE READING 45 PSI.  ON LANDING SMELLED BURNING SMELL IN COCKPIT.  LANDED WITHOUT INCIDENT.  INSPECTION OF THE NR 1 ENGINE REFLECTS REVEALED PYLON HARNESS BURNS NEAR THE ANTI-ICE MANIFOLD ASSY.  CAUSE WAS DUE TO THE FWD ANTI-ICE COUPLING ASSY (P/N-735138) LOOSE, DUE TO  HAVING A SHEARED BOLT (361615). BOLT, WASHER AND NUT WERE REPLACED WITH NEW PARTS, AND TORQUE IAW STANDARD PRACTICES. REMOVED AND REPLACED DAMAGE WIRING.  PERFORMED ENGINE RUN TEST AND PNEUMATIC SYSTEM CHECKS AND FOUND SATISFACTORY.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
