# SDR ASAA2013032794277

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 27, 2013
- Submitted: March 29, 2013
- Operation: Air carrier
- Aircraft: [N512AS](https://openairdocs.org/aircraft/N512AS), registered now
- Make and model: Boeing 737890
- Aircraft serial: 39043
- Aircraft time: 17,735 hours, 5,545 cycles
- System (JASC): [2810 · Fuel Storage](https://openairdocs.org/jasc/2810)
- Part: Fuel Cell
- Condition: Iced
- Stage of operation: TX
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/ASAA2013032794277

## Discrepancy

AFTER FUELING, FUEL GAUGES READ L 8.46, CTR 22.2, R 8.51 AT PRIOR TO PUSH CHECK RT FUEL GAUGE DROPPED BETWEEN 400-500 LBS OF FUEL.   ACCOMPLISHED E/A 800-28, EA-10038 FUEL QTY INDICATION SYS AFFECTED BY ICE FORMATION PROCEDURE.  SUMPED CTR FUEL TANK AND WING MAIN TANKS REF MM 12-11-00.  FOUND APPROX 6 OZS OF WATER IN CENTER TANK.  BOTH MAIN TANKS FOUND TO BE CLEAR OF ANY MOISTURE.   ACCOMPLISHED FUEL QTY BITE PROCEDURE REF FIM 28-41 TASK 801 NO CURRENT FAULTS LOGGED.  GROUND VERIFICATION CHECKS NORMAL.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.