# SDR ASOA20120119011

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 19, 2012
- Submitted: January 20, 2012
- Operation: Air carrier
- Aircraft: N15574
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145639
- Aircraft time: 23,002 hours, 18,142 cycles
- System (JASC): [2497 · Electrical Power System Wiring](https://openairdocs.org/jasc/2497)
- Part: Terminal
- Part number: MS25036157
- Condition: Overheated
- Location: Electrical
- Stage of operation: TX
- How discovered: O
- Nature of condition: B
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/ASOA20120119011

## Discrepancy

AFTER POWERUP, THE CREW REPORTED AN ELECTRICAL BURNING ODOR IN THE COCKPIT. MX R & R TERMINAL LUG ON WIRE W179-0001-001N IN THE LT POWER DISTRIBUTION BOX, PERFORMED OPS CHECKS WITH NO DEFECTS, AND THE ACFT WAS APPROVED FOR RETURN TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
