# SDR ASOA2018080877049

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 27, 2018
- Submitted: August 8, 2018
- Operation: Air carrier
- Aircraft: [N23139](https://openairdocs.org/aircraft/N23139), registered now
- Make and model: Emb EMB-145XR
- Registry model: [EMB EMB-145XR](https://openairdocs.org/model/embraer-emb-145xr) (OpenAirDocs)
- Aircraft serial: 145731
- Aircraft time: 40,806 hours, 24,338 cycles
- System (JASC): [5330 · Fuselage Main, Plate/Skin](https://openairdocs.org/jasc/5330)
- Part: Skin Splice
- Condition: Corroded
- Location: Frames 23-24
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/ASOA2018080877049

## Discrepancy

DURING A C CHECK INSPECTION, THE SKIN SPLICE BETWEEN  FRAMES 23 - 24, STRINGERS 18R AND 19R WAS CORRODED.  MAINTENANCE REPAIRED THE SKIN IAW SRM 53-00-02.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
