# SDR AUS20031138

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 7, 2003
- Submitted: January 5, 2004
- Operation: General aviation
- Make and model: Bac 146100A
- Engine: Lyc ALF502R5
- System (JASC): [2897 · Fuel System Wiring](https://openairdocs.org/jasc/2897)
- Part: Circuit Breaker
- Part number: MS154145
- Condition: Burned Out
- Location: Fuel Boost Pump
- Stage of operation: CR
- How discovered: O
- Nature of condition: B
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/AUS20031138

## Discrepancy

(AUS) LT INNER FUEL BOOST PUMP CIRCUIT BREAKER BURNED OUT.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
