# SDR C2XA08RI104

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 19, 2008
- Submitted: August 11, 2008
- Operation: Air carrier
- Aircraft: [N12540](https://openairdocs.org/aircraft/N12540), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145537
- Aircraft time: 16,171 hours, 12,407 cycles
- System (JASC): [3213 · Main Landing Gear Strut/Axle/Truck](https://openairdocs.org/jasc/3213)
- Part: Bolt
- Condition: Sheared
- Location: Mlg Strut
- Part time: 2,700 hours
- Component: Oleo Strut Assy
- Stage of operation: IN
- How discovered: C
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/C2XA08RI104

## Discrepancy

DURING INSTALLATION OF MAIN LANDING GEAR OLEO STRUT ASSEMBLY, UPPER ATTACHMENT BOLT SHEARED AT TORQUE BELOW 1200 IN LBS.  RIC MX REMOVED AND REPLACED UPPER ATTACHMENT BOLT, APPLIED TORQUE AND PERFORMED OPERATIONAL CHECK SUCCESSFULLY.  (S)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
