# SDR C2XA09SH049

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 13, 2009
- Submitted: February 13, 2009
- Operation: Air carrier
- Aircraft: [N11150](https://openairdocs.org/aircraft/N11150), registered now
- Make and model: Emb EMB-145XR
- Registry model: [EMB EMB-145XR](https://openairdocs.org/model/embraer-emb-145xr) (OpenAirDocs)
- Aircraft serial: 756
- Aircraft time: 15,476 hours, 8,246 cycles
- System (JASC): [2150 · Cabin Cooling System](https://openairdocs.org/jasc/2150)
- Part: Switch
- Part number: 8152915
- Part serial: 3348
- Condition: Malfunctioned
- Location: Ac Pack
- Stage of operation: CR
- How discovered: O
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/C2XA09SH049

## Discrepancy

A/C N11150 HAD PACK 2 OVERLOAD IN FLIGHT.  PUT ON MEL 21-51-00/2 CERT 163709 CAT C.  CLE MAINTENANCE REMOVED AND REPLACED PACK 2 TEMP SWITCH, OPERATIONAL AND LEAK CHECKS GOOD IAW EMB 145XR AMM 21-51-08.  AIRCRAFT WAS APPROVED TO RETURN TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
