# SDR C2XA11TY111

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 15, 2011
- Submitted: July 16, 2011
- Operation: Air carrier
- Aircraft: [N17159](https://openairdocs.org/aircraft/N17159), registered now
- Make and model: Emb EMB-145XR
- Registry model: [EMB EMB-145XR](https://openairdocs.org/model/embraer-emb-145xr) (OpenAirDocs)
- Aircraft serial: 145792
- Aircraft time: 21,165 hours, 11,353 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Clamp
- Condition: Loose
- Location: Bleed Air Sys
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/C2XA11TY111

## Discrepancy

TYS - A/C WAS LEAVING IND WHEN A BLEED 2 LEAK  ICIAS MESSAGE APPEARED.  CREW RETURNED TO BLOCK AND A/C WAS FERRIED TO TYS WHERE MAINTENANCE TORQUED SEVERAL CLAMPS IN THE RT PYLON.  PERFORMED  AIR BLEED SYSTEM OPS CHECK.  CHECKED GOOD IAW EMB 145XR AMM 36-00-00.  A/C WAS RELEASED TO SERVICE BUT WAS PUT ON A EXTENDED CHRONIC WORK SHEET TO FURTHER EVALUATE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
