# SDR C77A2019111900001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 19, 2019
- Submitted: November 19, 2019
- Operation: Air carrier
- Aircraft: N617CZ
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000210
- Aircraft time: 31,544 hours, 19,275 cycles
- System (JASC): [5310 · Fuselage Main, Structure](https://openairdocs.org/jasc/5310)
- Part: Doubler
- Part number: 17003238005
- Condition: Corroded
- Location: Zone 100
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/C77A2019111900001

## Discrepancy

DURING THE B6 BASIC CHECK AT EAMS, CORROSION DAMAGE WAS DISCOVERED IN THE FORWARD FUSELAGE AT THE RH COCKPIT FLOOR DOUBLER (P/N 170-03238-005) DURING INSPECTION IN THE AREA. THE DAMAGE EXCEEDED THE LIMITS PROVIDED IN THE SRM BECAUSE OF ITS DEPTH. EAMS REQUESTED AND RECEIVED APPROVED REPAIR DISPOSITION FROM RTS IN THE FORM OF ETD2019-170-155110 AND ITS CORRESPONDING ANAC DER FORM. THIS EO IS BEING ISSUED TO PROVIDE INSTRUCTIONS TO ACCOMPLISH A PERMANENT REPAIR OF CORROSION TO THE RH COCKPIT FLOOR DOUBLER BY SPLICING IN A NEW SECTION OF THE FLOOR DOUBLER PER ETD2019-170-155110. ACCOMPLISHMENT OF THIS EO HAS BEEN CLASSIFIED AS A MAJOR REPAIR BECAUSE THE RH COCKPIT FLOOR DOUBLER IS A PSE AND THIS EO IS RESTORING STRENGTH. EO E175-53MR-467 IS BEING ACCOMPLISHED BY WO 2785394

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
