# SDR CA000516004

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 6, 2000
- Submitted: June 23, 2000
- Operation: Air carrier
- Make and model: Lear 45LEAR
- Aircraft time: 60 hours
- System (JASC): [2910 · Hydraulic System, Main](https://openairdocs.org/jasc/2910)
- Part: Shutoff Valve
- Part number: 5918891
- Condition: Failed
- Location: Fuel System
- Component: Hydraulic Main S
- Stage of operation: IN
- How discovered: O
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA000516004

## Discrepancy

(CAN) DURING HYD PUMP REPLACEMENT EXCESSIVE AMOUNT OF OIL WAS PUMPED WHEN INLET LINE TO HYD PUMP DISCONNECTED. FURTHER INVESTIGATION FOUND THE FIREWALL S/O VALVE DID NOT CLOSE WHEN SELECTED. DIODE D101 FAILED. PARTS REPLACED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
