# SDR CA000621002

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 21, 2000
- Submitted: January 22, 2001
- Operation: Air carrier
- Make and model: Dhav DHC8102
- Aircraft time: 28,597 hours
- Engine: Pwa PW120A
- Propeller: Hamstd 14SF7
- System (JASC): [3060 · Propeller/Rotor Anti-Ice/De-Ice System](https://openairdocs.org/jasc/3060)
- Part: Relay
- Part number: KCD4N
- Condition: Failed
- Location: Deice System
- Stage of operation: NR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA000621002

## Discrepancy

(CAN) THE FLIGHT CREW REPORTED THAT THE LT PROP HEAT PHASE B CIRCUIT BREAKER POPPED. MAINTENANCE REPLACED PROP RELAYS 3061-K1 AND 3061-K3, AND THE AIRCRAFT WAS RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
