# SDR CA000802009

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 14, 2000
- Submitted: January 19, 2001
- Operation: Air carrier
- Make and model: Lkheed 1011385114
- Aircraft time: 56,769 hours
- Engine: Rroyce RB21122B02
- System (JASC): [2910 · Hydraulic System, Main](https://openairdocs.org/jasc/2910)
- Part: Line
- Condition: Leaking
- Location: Hyd System
- Stage of operation: CL
- How discovered: O
- Nature of condition: K, J
- Precautionary procedure: H
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA000802009

## Discrepancy

(CAN) HYDRAULIC FLUID QUANTITY ON SYSTEM A DECREASING, CREW SWITCHED THE PUMP OFF AND STOPPED THE LEAK. MAINTENANCE FOUND PRESSURE LINE FITTING LEAKING AT ENGINE DRIVEN PUMP. O-RING REPLACED AND A/C RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
