# SDR CA001013033

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 29, 2000
- Submitted: January 22, 2001
- Operation: General aviation
- Make and model: Bell 205A-1
- Registry model: [Bell 205A-1](https://openairdocs.org/model/bell-205a-1) (OpenAirDocs)
- Aircraft time: 18,098 hours
- Engine: Lyc T5313B
- System (JASC): [2910 · Hydraulic System, Main](https://openairdocs.org/jasc/2910)
- Part: Line
- Part number: 212076372001
- Condition: Chafed
- Location: Hyd System
- Part time: 293 hours
- Stage of operation: IN
- How discovered: O
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA001013033

## Discrepancy

(CAN) NR 1 HYDRAULIC SYSTEM RETURN LINE WAS CHAFED WITH NR 2 PUMP PRESSURE LINE,  REPLACED. THIS TUBE ASSEMBLY WAS INSTALLED 293.1 HOURS BEFORE.FOUND PRESSURE LINE WAS ROUTED OTHER SIDE OF NR 2 PUMP.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
