# SDR CA010704020

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 13, 2001
- Submitted: July 5, 2001
- Operation: Air carrier
- Make and model: Lkheed 1011385114
- Aircraft time: 67,367 hours
- Engine: Rroyce RB21122B02
- System (JASC): [4930 · APU Engine Fuel and Control](https://openairdocs.org/jasc/4930)
- Part: Heat Exchanger
- Part number: 10552E
- Condition: Cracked
- Location: Fuel Heater
- Stage of operation: IN
- How discovered: V
- Nature of condition: K
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA010704020

## Discrepancy

(CAN) FUEL LEAK AT HEAT EXCHANGER CORE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
