# SDR CA011210001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 27, 2001
- Submitted: February 5, 2002
- Operation: Air carrier
- Make and model: Snias AS332L
- Aircraft time: 13,461 hours
- Engine: Tmeca MAKILA1A
- System (JASC): [2810 · Fuel Storage](https://openairdocs.org/jasc/2810)
- Part: Panel
- Part number: 7965592
- Condition: Inoperative
- Location: Refueling
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA011210001

## Discrepancy

(CAN) PRESSURE REFUELING CONTROL PANEL WILL NOT PERMIT SINGLE POINT REFUELING TO BE CARRIED OUT.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
