# SDR CA021115001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 7, 2002
- Submitted: December 2, 2002
- Operation: General aviation
- Make and model: Cndair CL6002B19
- Engine: Ge CF343A1
- System (JASC): [2797 · Flight Control System Wiring](https://openairdocs.org/jasc/2797)
- Part: Wire Harness
- Condition: Failed
- Location: Te Flaps
- Part time: 16,666 hours, 15,449 cycles
- Stage of operation: LD
- How discovered: O
- Nature of condition: N
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA021115001

## Discrepancy

(CAN) AFTER TAKE OFF,  WHEN FLAPS WERE RETRACTED, STALL FAIL CAUTION MESSAGE APPEARED ACCOMPANIED BY HYD CAUTION FOR HYD PUMP 1B & 3B.  STALL TAPE ON CAPTAINS & F/O'S PFD APPEAR TO RUN FULL LENGTH OF AIR SPEED INDICATOR.  AIRCRAFT FERRIED FOR TROUBLESHOOTING. R&R FLAP POSITION TRANSMITTER WIRING HARNESS AND OPS CHECKED SERVICEABLE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
