# SDR CA031015002

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 13, 2003
- Submitted: November 3, 2003
- Operation: General aviation
- Make and model: Cndair CL6002B19
- Aircraft time: 17,027 hours
- Engine: Ge CF343A1
- System (JASC): [2913 · Hydraulic Pump (Electric/Engine), Main](https://openairdocs.org/jasc/2913)
- Part: Pump
- Part number: 848847
- Condition: Failed
- Location: Hyd System
- Stage of operation: CR
- How discovered: O
- Nature of condition: K, J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA031015002

## Discrepancy

(CAN) HYD NR 2 QUANTITY DROPPED STEADILY DURING FLT. AT LANDING HAD NR 2 QTY AT 25 PERCENT DECLARED EMERGENCY AND LANDED NORMALLY IN ALBANY. PUMP CHANGED, SYSTEM FLUSHED AND FILTERS CHANGED ALL NOW NORMAL

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
