# SDR CA050201005

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 29, 2005
- Submitted: March 3, 2005
- Operation: General aviation
- Make and model: Doug DC-9-83
- Registry model: [Doug DC-9-83](https://openairdocs.org/model/douglas-dc-9-83) (OpenAirDocs)
- Aircraft time: 22,403 hours
- Engine: Pwa JT8D219
- System (JASC): [3150 · Central Warning](https://openairdocs.org/jasc/3150)
- Part: Warning Horn
- Condition: Activated
- Location: Cockpit
- Stage of operation: TO
- How discovered: O
- Nature of condition: J
- Precautionary procedure: C
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA050201005

## Discrepancy

(CAN) DURING TAKEOFF, AN AUDIBLE WARNING WAS HEARD FROM THE TAKEOFF WARNING COMPUTER.  THE TAKEOFF WAS ABORTED SUCCESSFULLY WITHOUT INCIDENT.  THE AIRCRAFT RETURNED TO THE GATE WHERE THE FLIGHT CREW ADJUSTED THEIR SETTINGS.  THE AIRCRAFT DEPARTED WITHOUT INCIDENT AND NO FURTHER PROBLEM DURING SUBSEQUENT FLIGHT.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
