# SDR CA081016007

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 15, 2008
- Submitted: November 3, 2008
- Operation: General aviation
- System (JASC): [7414 · Magneto/Distributor](https://openairdocs.org/jasc/7414)
- Part: Magneto
- Part number: D6RN3200
- Condition: Inoperative
- Location: Rt Engine
- Stage of operation: TX
- How discovered: O
- Nature of condition: R
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA081016007

## Discrepancy

(CAN) DURING PREFLIGHT RUN-UP RT ENG, RT MAGNETO EXPERIENCED EXCESSIVE DROP AND WAS RUNNING ROUGH. UPON INVESTIGATION OF THE MAGNETO IT WAS FOUND THAT THE DISTRIBUTOR GEAR BUSHING HAD WORN IN THE DISTRIBUTOR BLOCK HSG CAUSING A MISS FIRING CONDITION. MAGNETO WAS REPLACED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
