# SDR CA091021008

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 19, 2009
- Submitted: December 1, 2009
- Operation: General aviation
- Make and model: Cessna 425
- Registry model: [Cessna 425](https://openairdocs.org/model/cessna-425) (OpenAirDocs)
- Aircraft time: 6,429 hours
- Engine: Pwa PT6A135A
- Propeller: Mcauly 4HFR34C762
- System (JASC): [5514 · Horizontal Stabilizer Miscellaneous Structure](https://openairdocs.org/jasc/5514)
- Part: Bracket
- Part number: 58341309
- Condition: Cracked
- Location: Horizontal Stab
- Part time: 6,527 hours
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA091021008

## Discrepancy

(CAN) WHILE PERFORMING AN EDDY CURRENT INSPECTION TO COMPLY WITH A PHASE 31 SID INSPECTION, A CRACK WAS DETECTED IN THE OUTBOARD BRACKET THAT ATTACHES THE RT ELEVATOR TO THE H STAB. THE CRACK WAS NOT DETECTABLE VISUAL INSPECTION ALONE. (TC 20091021008)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
